Laserfiche WebLink
30-May-95 <br /> 02:03:05 PM <br /> QTIBST95 <br /> STREET PROJECTS 1994-95 <br /> TABLE 1 <br /> <br /> STREETS PROJECTS FUNDED PROJECTS ~ii ~i ~ <br /> RECOMM <br /> <br /> ADOFrED FROM ADOPTED ! ADJUSTED <br />CIP# PROJECT DESCRIPTION 1994-95 1993-94 AMENDMENTS AMEND l 1994-95 <br />852034 St. John Storm Drain 30,000 30,000 <br />868043 Widening of Busch Rd. ~ OSC 121,375 121,375 <br />885021 Pavement Manager Software 14,721 14,721 <br />887058 Senior Center Storm Drain 5,509 5,509 <br />895021 Bridge Painting 29,661 27,000 56,661 <br />905006 Main St. Pavement & Utility Rec. onsmaction-Phas~ I 28,554 28,554 <br />905022 Storm Drain Extension Kotting~r to Amaral Circle 4,382 4,382 <br />90 5023 Hopyard Rd. Crack Mitigation 100,000 (100,000 0 <br />915012 Hopyard Rd. Resurfacing 30.078 30,078 <br />915012 Hopyard Rd. (Valley/Del Valle) Grant Portion 31 31 <br />915012 Hopyard Rd. (Valley/Del Valle) Local Match + Conring 69,209 69,209 <br />915012 iSanta Rita (Pimlico/Rosewood) Grant Portion 7 7 <br />915012 Santa Rita (Pimlico/Rosewood) Local Match 16,234 16,234 <br />915013 Sunol Blvd. Median Landscaping 57,000 57,000 <br />915033 Hopyard Landscap= Improvement-Black to Del Valle 50,488 50,488 <br />925003 Resurfacing Various City Smuts 150,861 (150,861) 0 <br />925021 Interim Parking-Main St. Construction 9,295 9,295 <br />925022 Installation of New Sidewalks 20,782 20,782 <br />925025 Bike Path Arroyo de la LaCuna & Pleasonton Canal Bridge I 1,808 ( 11,808) 0 <br />925036 Internally Illuminated Street Signs 12,720 (12,720) 0 <br />925038 Central Traffic Computer 146.000 146,000 <br />925039 Traffic Signal (Bernal/Foothill Rd.) 140.000 (140.000) 0 <br />935003 Annual Resurfacing Various City Streets 365,611 150,861 516,472 <br />935004 Annual Slurty Seal Project 100,943 (26,176~ 74,767 <br />935006 Annual Street Lighting Upgrade 10,000 (10,000' 0 <br />935007 Annual Traffic Button & Line Markers 50.000 (50,000TM 0 <br />935008 Annual Handicap Ramp Installations 4,529 (2,810', 1,719 <br />935027 Arroyo de la LaCuna Bike Path: Arroyo Mucho/CC CTY 629,830 629,830 <br />935028 Arroyo de la Laguna Bike Path: Arroyo DV/Pleas Canal 75,000 75.000 <br />935030 Extension of Livingston Way 12,000 12,000 <br />935032 Traffic Signal Controller Replacement &Bike Loops 102,000 102,000 <br />935043 Resurface Various City Parking Lots 35,000 35,000 <br />935044 Stoneridge Dr./Foothill Rd. Optimization 19,200 19,200 <br />935045 Removal of Old Bemal Bridge Foundations 22.500 22.500 <br />935046 Street Repairs Hacienda Business Park 111,637 ( 111,63T~ 0 <br />945003 Annual Resurfacing Various City Streets 600,000 600,000 <br />945004 Annual Slurry Seal Project 65,000 26,176 91.176 <br />945005 Annual Traffic Loop/Pavement Replacement 20,000 36,000 56~000 <br />945006 Annual Street Lighting Upgrade 10,000 I 0,000 20,000 <br />945007 Annual Traffic Button and Line Markers 25,000 i 30,000 55,000 <br />945013 Annual SU~et Tree Planting 10,000 10.000 <br />945029 !Extension of Junipero Street 1,000,000 1,000~000 <br />945030 Internally Illuminated Street Signs 16,000 (3,280 12,720 <br />945031 Installation of New Sidewalks 30.000 30,000 <br />945032 Vineyard Avenue Soundwall 45,000 45,000 <br />945033 New Storm Drain on Abbie St & Angela St (lst St- 3rd St) 22,700 22,700 <br />945034 Arroyo Mocho Slope Repairs at Hopyard Bridge 94,500 94,500 <br /> Partial Funding From Outside Sources <br />945036 Santa Rita Rd Resurfacing (Rosewood - W. Las Positas) 173,000 173~000 <br />945037 Rose Avenue Rcconsmaction (Pleasanton Ave to Fair St) 59,000 59,000 <br /> 100% Funding From Outside Sources <br />945035 Foothill Road Utility Underground 260,000 260,000 <br />945008 Annual Handicap Ramp Installation 49,000 2,810 51,810 <br /> STREET PROJECT TOTAL '~i$2~479;200i !!ii!~i~$2,465,~90:::'~i~ :($21~3) !{$211,637) i$4~29~720ii] <br /> <br /> <br />