Laserfiche WebLink
Mr. Mike Fulford <br /> Page Two " <br /> December 28, 1994 <br /> <br /> · The wind screens on the existing tennis courts were identified as <br /> inadequate- The sides of the courts oriented toward the future <br /> administration building and terrace were left open by design. <br /> · The "pay to play" concept for the phase 2 & 3 tennis courts is desirable. <br /> Basketball Court <br /> <br /> · There was a general consensus that the court was an important program <br /> element- <br />; <br />,. · There was concern expressed with regard to lighting the court for night <br /> use. <br /> <br /> · An interest in additional courts or multi-use courts was expressed. <br /> <br /> · The discussion with regard to multi-use courts included an expressed <br /> interest for an in-line hockey rink. <br /> <br /> · A request was made for a stand alone in-line hockey rink with <br /> sideboards. <br /> <br /> Putting Green and Golf Practice Cage <br /> <br /> · There was general agreement that the putting green and golf practice <br /> cage was an undesirable program element because of cost and the <br /> proximity of an existing driving range and putting green- <br /> <br /> Handball <br /> <br /> · Several people expressed an interest in handball as a program element. <br /> : <br /> <br /> * · A desire to expand the number of courts from four to eight to <br /> : accommodate tournament play was also expressed. <br /> <br /> · Bench seating adjacent to the courts for spectators was requested. <br /> <br /> · An interest in mounding and screening around the perimeter of the <br /> handbaR courts to soften their visual impact was discussed. <br /> <br /> <br />