Laserfiche WebLink
05-Jan-95 <br /> 04:44:55 PM <br /> <br /> STREET PROJECTS 1994-95 <br /> TABLE I <br /> <br /> STREETS PROJECTS FUNDEDPROJECTS <br /> CARRYOVER i ! 994-95 IADJUSTED <br /> ADOPTED FROM ADOPTED I~STC(~4dvl. <br /> CIP# PROJECT DESCRIPTION 1994-95 1993-94 IAMENDMENTS AMEND [1994-95 <br /> 852034 St. John Storm Drain 30,000 ! 30.000 <br /> 885021 Pavement Manager SotSware 14,721 !~ 14.721 <br /> 887058 Senior Center Storm Drain 5,509 I 5.509 <br /> 895021 Bridge Painting 29,661 ] 29.661 <br /> 905006 Main St. Pavement &Utility Reconstruction-Phase I 28,554 28.554 <br /> 905022 Storm Drain Extension Kottinger to Amaral Circle 4,382 4,382 <br /> 90 5023 Hopyard Rd. Crack Mitigation I00,000 100.000 <br /> 915012 Hopyard Rd. Resurfacing 30,078 30.078 <br /> 915012 Hopyard Rd. (Valley/Del Valle) Grant Portion 31 31 <br /> 915012 Hopyard Rd. (Valtey/Del Valle) Local Match + Conting 69,209 69.209 <br /> 915012 Santa Rita (Pimlico/Rosewood) Grant Portion 7 7 <br /> 915012 Santa Rita (Pimlico/Rosewood) Local Match 16,234 16,234 <br /> 915013 Sunol BIvd. Median Landscaping 57,000 57.000 <br /> 915033 Hopyard Landscape Improvement-Black to Del Valle 50,488 50.488 <br />925003 Resurfacing Various City Streets 150,861 (150,861) 0 <br />925021 Interim Parking-Main St. Construction 9,295 9,295 <br />925022 Installation of New Sidewalks 20,782 20,782 <br />925025 Bike Path Arroyo de la Laguna & Pieasonton Canal Bridge 11,808 : ( 11,808) 0 <br />925036 Internally Illuminated Street Signs 12,720 (12,720), 0 <br />925038 Central Traffic Computer 146,000 146,000 <br />925039 Traffic Signal (Bernal/Foothill Rd.) 140,000 (140,000 0 <br />935003 Annual Resurfacing Various City Streets 365,611 150,861 516,472 <br />935004 Annual Slurry Seal Project 100,943 (26,176 74,767 <br />935006 Annual Street Lighting Upgrade 10,000 (10,000~ 0 <br />935007 Annual Traffic Button & Line Markers 50,000 (50,000 0 <br />935008 Annual Handicap Ramp Installations 4,529; (2,810 1,719 <br />935027 Arroyo de la Laguna Bike Path: Arroyo Mucho/CC CTY 629,830 i 629,830 <br />935028 Arroyo de la Laguna Bike Path: Arroyo DV/Pieas Canal 75,000 75,000 <br />935030 Extension of Livingston Way 12,000 12,000 <br />935032 Traffic Signal Controller Replacement &Bike Loops 102,000 102,000 <br />935043 Resurface Various City Parking LoB 35,000 35,000 <br />935044 Stoneridge Dr./Foothill Rd. Optimization 19,200 19,200 <br />935045 Removal of Old Bernal Bridge Foundations 22,500 22,500 <br />935046 Street Repairs Hacienda Business Park 111,637 i i 1,637 <br />945003 Annual Resurfacing Various City Streets 600,000: 600,000 <br />945004 Annual Slurry Seal Project 65,000 i 26,176 91,176 <br />945005 Annual Traffic Loop/Pavement Replacement 20,000 36,000 56,000 <br />945006 Annual Street Lighting Upgrade 10,000 10,000 20,000 <br />945007 Annual Traffic Button and Line Markers 25,000 30,000 55,000 <br />945013 Annual Street Tree Planting 10,000 10,000 <br />945029 Extension of Junipero Street 1,000,000 1,000,000 <br />945030 Internally Illuminated Street Signs 16,000 (3,280) 12,720 <br />945031 Installation of New Sidewalks 30,000 30,000 <br />945032 Vineyard Avenue Soundwall 45,000 45,000 <br />945033 New Storm Drain on Abbie St & Angela St (lst St- 3rd St) 22,700 22,700 <br />945034 Arroyo Mocho Slope Repairs at Hopyard Bridge 94,500 94,500 <br /> !Partial Funding From Outside Sources <br />945036 Santa Rita Rd Resurfacing (Rosewood - W. Las Positas) 173,000 173,000 <br />945037 Rose Avenue Reconstruction (Pleasanton Ave to Fair St) 59,000 59,000 <br /> 100% Funding From Outside Sources <br />945035 Foothill Road Utility Underground 260,000 260,000 <br />945008 Annual Handicap Ramp Installation 49,000 2,810 51,810 <br /> <br /> STREET PROJECT TOTAL $2,479,200 $2,465;590 $0 ($151,808)] $4,792,982 <br /> <br /> <br />