<br /> STREET PROJECTS 1994-95
<br /> TABLE I
<br />
<br /> STREETS PROJECTS FUNDEDPROJECTS
<br /> CARRYOVER i ! 994-95 IADJUSTED
<br /> ADOPTED FROM ADOPTED I~STC(~4dvl.
<br /> CIP# PROJECT DESCRIPTION 1994-95 1993-94 IAMENDMENTS AMEND [1994-95
<br /> 852034 St. John Storm Drain 30,000 ! 30.000
<br /> 885021 Pavement Manager SotSware 14,721 !~ 14.721
<br /> 887058 Senior Center Storm Drain 5,509 I 5.509
<br /> 895021 Bridge Painting 29,661 ] 29.661
<br /> 905006 Main St. Pavement &Utility Reconstruction-Phase I 28,554 28.554
<br /> 905022 Storm Drain Extension Kottinger to Amaral Circle 4,382 4,382
<br /> 90 5023 Hopyard Rd. Crack Mitigation I00,000 100.000
<br /> 915012 Hopyard Rd. Resurfacing 30,078 30.078
<br /> 915012 Hopyard Rd. (Valley/Del Valle) Grant Portion 31 31
<br /> 915012 Hopyard Rd. (Valtey/Del Valle) Local Match + Conting 69,209 69.209
<br /> 915012 Santa Rita (Pimlico/Rosewood) Grant Portion 7 7
<br /> 915012 Santa Rita (Pimlico/Rosewood) Local Match 16,234 16,234
<br /> 915013 Sunol BIvd. Median Landscaping 57,000 57.000
<br /> 915033 Hopyard Landscape Improvement-Black to Del Valle 50,488 50.488
<br />925003 Resurfacing Various City Streets 150,861 (150,861) 0
<br />925021 Interim Parking-Main St. Construction 9,295 9,295
<br />925022 Installation of New Sidewalks 20,782 20,782
<br />925025 Bike Path Arroyo de la Laguna & Pieasonton Canal Bridge 11,808 : ( 11,808) 0
<br />925036 Internally Illuminated Street Signs 12,720 (12,720), 0
<br />925038 Central Traffic Computer 146,000 146,000
<br />925039 Traffic Signal (Bernal/Foothill Rd.) 140,000 (140,000 0
<br />935003 Annual Resurfacing Various City Streets 365,611 150,861 516,472
<br />935004 Annual Slurry Seal Project 100,943 (26,176 74,767
<br />935006 Annual Street Lighting Upgrade 10,000 (10,000~ 0
<br />935007 Annual Traffic Button & Line Markers 50,000 (50,000 0
<br />935008 Annual Handicap Ramp Installations 4,529; (2,810 1,719
<br />935027 Arroyo de la Laguna Bike Path: Arroyo Mucho/CC CTY 629,830 i 629,830
<br />935028 Arroyo de la Laguna Bike Path: Arroyo DV/Pieas Canal 75,000 75,000
<br />935030 Extension of Livingston Way 12,000 12,000
<br />935032 Traffic Signal Controller Replacement &Bike Loops 102,000 102,000
<br />935043 Resurface Various City Parking LoB 35,000 35,000
<br />935044 Stoneridge Dr./Foothill Rd. Optimization 19,200 19,200
<br />935045 Removal of Old Bernal Bridge Foundations 22,500 22,500
<br />935046 Street Repairs Hacienda Business Park 111,637 i i 1,637
<br />945003 Annual Resurfacing Various City Streets 600,000: 600,000
<br />945004 Annual Slurry Seal Project 65,000 i 26,176 91,176
<br />945005 Annual Traffic Loop/Pavement Replacement 20,000 36,000 56,000
<br />945006 Annual Street Lighting Upgrade 10,000 10,000 20,000
<br />945007 Annual Traffic Button and Line Markers 25,000 30,000 55,000
<br />945013 Annual Street Tree Planting 10,000 10,000
<br />945029 Extension of Junipero Street 1,000,000 1,000,000
<br />945030 Internally Illuminated Street Signs 16,000 (3,280) 12,720
<br />945031 Installation of New Sidewalks 30,000 30,000
<br />945032 Vineyard Avenue Soundwall 45,000 45,000
<br />945033 New Storm Drain on Abbie St & Angela St (lst St- 3rd St) 22,700 22,700
<br />945034 Arroyo Mocho Slope Repairs at Hopyard Bridge 94,500 94,500
<br /> !Partial Funding From Outside Sources
<br />945036 Santa Rita Rd Resurfacing (Rosewood - W. Las Positas) 173,000 173,000
<br />945037 Rose Avenue Reconstruction (Pleasanton Ave to Fair St) 59,000 59,000
<br /> 100% Funding From Outside Sources
<br />945035 Foothill Road Utility Underground 260,000 260,000
<br />945008 Annual Handicap Ramp Installation 49,000 2,810 51,810
<br />
<br /> STREET PROJECT TOTAL $2,479,200 $2,465;590 $0 ($151,808)] $4,792,982