Laserfiche WebLink
19-Nov-96 <br /> 10:42:35 AM <br /> QTR3ST96 <br /> STREET PROJECTS <br /> FISCAL YEAR 1996-97 (QTR 1) <br /> TABLE 1 <br /> <br /> CARRYOVER QTR 1 ADJUSTED <br /> ADOPTED ! FROM LAST YEAR ADOPTED 1996-97 BUDGET <br /> CIP~ tPROJECT DESCRIPTION 1996-97 1995-96 AMENDMENTS AMENDMENTS 1996..97 <br /> <br /> i 30,000'. 30.000 <br />852034 [St. John Storm Drain <br />885021 iPavement Manager Software 11.853 11,853 <br />895021 IB~dge Painting ~ 56,552: 56.552 <br />905006 IMain St. Pavement & Utility Reconstruction-Phase I ~ 4,175~ 4.175 <br /> <br />905022 ~Storm Drain Extension Kottinger to Amaral Circle 4,382i 4.382 <br />915033 !Hopyard Landscape Improvement-Black to Del Valle 32.957' 32.957 <br />925021 [Interim Parking-Main St. Construction 8,695! 8.695 <br />935027 IAxroyo de ia Laguna Bike Path: Arroyo Mucho/CC CrY 606.393i ~ 606.393 <br />935028 [Arroyo de la Laguna Bike Path: Arroyo DV/Pleus Canal 150,000i ', ! 50.000 <br /> 12,000 ~ : 12.000 <br />935030 ]Extension of Livingston Way 35.000: i 35.000 <br />935043 IResurface Various City Parking Lots 22,5001 22.500' <br />935045 iRemoval of Old Beroal Bridge Foundations 1,169,0301 1.169.030 <br />945029 ]Extension of Junipero Street i 15,490i 15,490 <br />945031 Ilnstallation of New Sidewalks ~ 33.915~ (1,699) 32216 <br />945032 [Vineyard Avenue Soundwall <br />945034 ~Atroyo Mocho Slope Repairs at Hopyard Bridge I ; 2,192: 2.192 <br />955003 [Annual Resuffacing Various City Streets i 24g,772~ (229.373) 19.399 <br />955004 ~Annual Slurry Seal Project ! 104,520~ 104.520~ <br />955006 iAnnunl Street Light Upgrnde '! 10,0001 10.000~ <br />955027 ilnstallation of New Sidewalks &Handicap Ramps , i 64.450! 64.450 <br /> <br />955028 tDrainage Improvements at Neal Street and Railroad Street 10,000] ! 10,000 <br />965003 [Annual Resurfncing Various City Streets 744,000~ 229,373 i (24,9701 948,403: <br /> 70.0001 <br />965004 IAnnual Slurry Seal Project 70,000! [ 20'000I <br />965005 !Annual Traffic Loop/Pavement Replacement 20,000 ! <br />965006 IAnnual Street Lighting Upgrade 10,0001 ~ i 10.000i <br />965007 i Annuai Traffic Button and Line Markers 25,000] ~ i 25,000 ! <br />965020 !Pleasnnton Ave Reconstr (Rose Ave - St John (~ UPRR) 1996-97 388.800] (5,915] (64,459) i 318.426, <br />965019 lTrnffic Signal Interconnect; Bernal at Independence (1996-97) 75,000~ I 75,000! <br /> 45,000 <br />965021 [Bridge Painting (1996-97) 45,000~ 16,000[ <br />965015 ~lntemally Illuminated Street Signs (1996-97) 16.000' 00 <br /> iTS: Valley Ave & Paseo Santa Cruz/Via de Los Milngros (1997-98) <br /> ISUmley BIrd Improve :East of California St to Reflections (1999-00) <br /> <br />955054 IHopyard Median/Parkway genorvation i 41,068 , <br />965038 !Foothill Road Emergency Repairs ~ 24,970 24,970 <br /> <br /> IPardal Funding From Outside Sources <br /> 945036 ISanta Rita Rd Rcsurfacing (Rosewood - W. Las Positas) <br /> 945037 IRose Avenue Reconstruction (Pleasanton Ave to Fair St) ; 654,717! 654,717 <br /> 945057 !Hopyard Rd Resurfacing (Stoneridge Dr. to N. of Owens) ~ 2,6131 2,613 <br /> 955029 ~First Su'eet Bridge at Arroyo Del Valle; Interim Improve (ISTEA/HBRR) 423,000~ I (36 422.964 <br /> 965022 [Hopyard Rd Resurfacing; Stonerdige Dr. An'oyo Mocho (1996-97) 613,000! (170,7973 442,203 <br /> <br /> I I00% Funding From Outside Sources ' 175,000 175,000 <br /> iStoneridgc Drive at Santa Rita Improvements -NPIDI I I 0 <br /> i Santa Rita at Valley; Intersection Improvements (1996-97)-NPIDi i ~ 0 <br /> BHopyard Road at Owens Drive Channelization (1996-97) <br /> IExtension of Livingston Way (1998-99) ] i 0: <br /> <br /> 955057 ;Canyon Way Widening 260,000i [ 260,000 <br /> IHopyard Rd at Ownes Drive; Channelization - NPIDI 30,000~ ! 30,000 <br /> <br /> I PARTICIPATION BY OTHER FUNDS <br /> iSEWER FUND: PieRunion Ave. Reconstrdcdon ! (S147,500! ~ $64J59~ I (83.041: <br /> 'WATER FUND: Extension of Junipero ! ($,13~-~2~ (43,.q2~. <br /> <br /> <br />