My WebLink
|
Help
|
About
|
Sign Out
RES 96088
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1996
>
RES 96088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 8:32:17 AM
Creation date
2/24/1999 6:49:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/6/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III, Constraints on Housing (65583(a)(4) and (5)) <br />List pages where the housing constraints listed below are discussed: Page <br /> A. Governmental Constraints (QA-10) <br /> 1. Ijand. use controls (e.g. zoning, growth controls, open space requirements) <br /> 2. Codes and enforcement (e.g. any local amendments to UBC, degree or type of <br /> enforcement) <br /> 3. On/off-site improvements (e.g. parking, street widths, lot coverage requirements) <br /> 4. Fees and exactions (permit fees & land ded'icat"ion or other r'eq~?'ir ts 'np3sed on <br /> 5. Processing and permit procedures (e.g. processing times, approval procedures) <br /> 6. Other governmental constraints <br /> B. Nongovernmental Constraints (QA-].2) 5EP_- <br /> 1. Availability of financing <br /> 2. Price of land <br /> 3. Cost of construction <br /> 4. Other nongovernmental constraints <br /> <br /> IV. Quantified Objectives (Section 65583(b)) <br /> List cluantified objectives for the maximum number of housing units over the .five year <br /> time frame of the element to be: (QA-16) <br /> A. Constructed '~I 5'~t7 <br /> B. Rehabilitated ~D (. <br /> C. Conserved /~.r._L 'T~'- <br /> <br /> V, Other Topics <br /> <br /> List pages where the following topics are discussed: <br /> <br /> A.Efforts to achieve public participation of all economic segements of the community <br /> in the development of the element (Section 65583(c)) (QA-33) <br /> <br /> B. Analysis of opportunities for energy conservation in residential development <br /> (Section 65583(a)(7))(QA-15) ']~7-t'?._ <br /> <br /> C. Description of means by which consistency will be achieved with other general <br /> plan ele,rnents (Section 65583(c))(QA-34) ']~'_ <br /> D.Evaluation and revision of the previous element according to the criteda of Section <br /> 65588(a) and (b): (13A-1) <br /> 1. 'Eflectiveness of the element' (Section 65588(a)(2)): A comparisoR of the actual <br /> result of the earlier element with its goals, objectives, policies, and programs. <br /> The results should be quantified where possible (e.g., rehabilitalion results), but <br /> may be qualitative where necessary (e.g., mitigation of governmental constraints). ' <br /> <br /> 2. 'Progress in implementation' (Section 65588 (a)(3)): An analysis of the <br /> significant differences between what was projected or planned in the earlier <br /> element and what was achieved. <br /> <br /> 3. 'Appropriateness of goals, objectives, and policies' (Section 65588 (a)(1)): A <br /> description of how lhe goals. objectives, policies, and programs of the updated <br /> element incorporate whal has been learned from the results ol the prior elemenl. <br /> E. For Coastal Zone localities, list the pages where the required intormation regarding .__n.~o._ <br /> construclion, demolitions and conversions within the costal zone is provided (Section <br /> 65588(c) and (d)). (QA-35) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.