29-Apr-96
<br /> 08:35:37 AM
<br /> QTR3ST96
<br /> STREET PROJECTS
<br /> FISCAL YEAR 1995-96 (QTR 3)
<br /> TABLE 1
<br /> STREETS PROJECTS FUNDED PROJECTS
<br /> RECOM
<br /> 3RD QTR
<br /> ADOPTED CARRYOVER ADOPTED AMEND ADJUSTED
<br />CIt~ PROJECT DESCRIPTION 1995-96 FROM 1994-95 I AMENDMENTS 1995-96 1995-96
<br />852034 St. John Storm Drain 30;000 30,000
<br />868043 Widening of Busch Rd. ~ OSC 14.521 336 14,857
<br />885021 Pavement Manager Software 40000 I 12,798 52,798
<br />887058 Senior Center Storm Drain. ~ 5,509 (5,509) 0 !
<br />895021 Bridge Painting 56,661 56,661
<br />905006 Main St. Pavement &Utility Reconstruction-Phase I 4, 175 4, 175
<br />905022 Storm Drain Extension Kottinger to Amaral Circl~ 4,382 4,382 I
<br />915012 Hopyard Rd. Resurfacing (795) (795)!
<br />915012 Hopyard Rd. (Valley/Del Valle) Grant Portion
<br />915012 Santa RAta (Pimlico/Rusewood) Grant Portion
<br />915012 Santa RAta (Pimlico/l~sewood) Local Match
<br />915033 Hopyard Landscape Improvement-Black to Del Valle 32,957 32.957
<br />925021 Interim Parking-Main St. Construction 8,695, 8,695
<br />935027 Arroyo de la Laguna Bike Path: Arroyo Mucho/CC CTY 629,830 629,830
<br />935028 Arroyo de la Laguna Bike Path: Arroyo DV/Pleas Canal 75,000 75,000 ]
<br />935030 Extension of Livingston Way 12,000 12,000
<br />935043 iResurface Various City Parking Lots 35,000 35,000 [
<br />935045 IRemoval of Old Bernal Bridge Foundations 22,500 22,500
<br />945003 Annual Resuffacing Various City Streets 306,168 306,168
<br />945004 Annual S!urry Seal Project 91,176 (39,595) 51,581
<br />945007 Annual Traffic Button and Line Markers 43,046 (5,313) 37,733
<br />945029 Extension of Junipcro Street 848,702 I 352,500 1,201,202
<br />945030 internally Illuminated Street Signs 0
<br />945031 Installation of New Sidewalks 10,620 ! 8.000 18,620
<br />945032 Vineyard Avenue Soundwall 45,000 12,584 57,584
<br />945033 New Storm Drain on Abbie St & Angela St (I st St- 3rd St) 53,000 (5,022) 47,978
<br />945034 Arroyo Mocho Slope Repairs at Hopyard Bridge 93,508 t 58,840 152,348
<br />955003 Annual Resurfacing Various City Streets 513,500 ] 46,836 560,336
<br />955026 Resurface Stoneridge Dr. in Hacienda Business Park 584,753 (92,362) 492,391
<br />955004 Annual Slurry Seal Project 65,000 39,595 104,595
<br />955005 Annual Traffic Loop/pavementreplacement 20,000 (14,763) 5,237
<br />955006 Annual Street Light Upgrade 10,000 I 0,000
<br />955007 Annual Traffic Button and Line market 25,000 (25,000) 0
<br />955027 InStallation of New Sidewalks &Handicap Ramps 70,000 (5,550) 64,450
<br />955028 Drainage Improvements at Neal Street and Railroad Street 10,000 10,000
<br />965020 Pleasanton Ave Reconstr (Rose Ave - St John ~ UPRR) 1996-97 26,200
<br />965019 Traffic Signal Interconnect; Bernal at Independence (1996-97)
<br />965021 Bridge Painting (1996-97)
<br />965015 Internally Illuminated Street Signs (1996-97)
<br /> TS: Valley Ave & Paseo Santa CruzfVia dc Los Milagros (1997-98)
<br /> Stanley Blvd Improve :East of California St to Reflections (1999-00)
<br />955055 Bernal Ave @ Miradot- left turn lane 17,839 17,839
<br />955054 Hopyard Median/Parkway Renorvation 41,250 41,250
<br /> Partial Funding From Outside Sources
<br />945036 Santa Rita Rd Kcsuffacing (Rosewood - W. Las Positas) 192,975 39,763 232,738
<br />945037 Ros~ Avenue Reconstruction (Pleasanton Ave to Fair St) 607,400 52,288 __ 659,688
<br />945008 Annual Handicap Ramp Installation · 51,668 5,419 57,087
<br />945057 Hopyard Rd Resurfacing (Stoneridge Dr. to N. of Owens) 381.300 381.300
<br />955029 First SWeet Bridge at Arroyo Del Valic; Interim Improvements 155,900 i 55,900
<br />965022 Hopyard Rd Resurfacing; Stonerdige Dr. Arroyo Mocho (1996-97)
<br /> 100% Funding From Outside Sources
<br /> Stoneridge Drive at Santa Rita Improvements 175.000 175,000
<br /> Santa RAta at Valley; Intersection Improvements (1996-97)
<br /> Hopyard Road at Owens Drive Channelization (1996-97)
<br /> Extension of Livingston Way (1998-99)
<br />
<br /> STI~KF.T PROJECT TOTAL $2,699~I03 $2,732,179 [ $401,083 ! $12,920 $5,819,085
<br />
<br />
<br />
|