Laserfiche WebLink
09:00:57 AM <br /> QTR I ST96 <br /> STREET PROJECTS 199596 <br /> TABLE 1 <br /> Q'rR 1 REVIEW <br /> RECOM <br /> I ST QTR <br /> ADOPTED CARRYOVER ADOPTED AMENDT AD.rUSTED <br />~ pROHECTDESCRIF~ON 1995-96 FROM 1994-95 AMENDM~'~TS 1995-96 1995..96 <br />852034 St. John Storm Drain 30r000 30~000 <br />868043 Witl~-~mg of Busch Rd. ~} OSC 14r521 14,521 <br />885021 Pavement bimmg~r Soflwm~ 40000 127798 52?798 <br />887058 Senior Centor Storm Drain 5?509 5r509 <br />895021 Bridge Paiating 567661 567661 <br />905006 Main SL Pavemm~t &Utility P,e~m.m~ion-Pha~ 1 4~175 47175 <br />905022 Storm Dram Extensio~ Ko~ing~ m Am~ml Civic 4r382 4~3~2 <br />915012 Hopyani Rd. R~uda~in6 0 <br /> 0 <br />915012 Hopyard Rd. (Valley/l~l Valk) Grant Portion <br />915012 Santo Rila (Pimlico/Ro~wood) Gtm~t Portion 0 <br />915012 Santo Rim (Pimlico/Ro~-wood) Local ~ 0 <br />915013 Sunol Blvd. M~ii~m L~nd~ping 0 <br />915033 Hopyard ~ lmptov~mont-Bl~k to 1~1 Va!le 32~957 327957 <br />925021 Interim Pa~ing-M~in St. Cunm~on 8~695 8?695 <br />925022 Installation of New Sidew~ik~ 0 <br />925038 C~nu~ Tra~c COmpute' 0 <br />935003 ~nnu~l R~urfac~g V~io~ City Sm~d 0 <br />935004 Annual Slun~ ~ Proj~:t 0. <br />935008 Annual H~ndi~p R~mp In~allafi~ 0 <br />93502? ~royo de h Lagu~ Bike Path: Arroyo Mu~ho/CC CTY 629?630 629?830 <br />935028 ~royo de la La~un~ Bike Path: An'oyo DV/PI~ C_,anai 75?000 ?5?000 <br />935030 Extension of Livi~s~n Way 12~000 12~000 <br />935032 rmffic Signl ConU~B~r R~l~,~mem &Bike Loops 0 <br />935043 Rcsuffacc Various City !~'king Lots 35~000 35~000 <br />935044 Stoneridgc Dr./Foothill Rd. Optimization 0 <br />935045 Removal of Old Bmml Bridge Foundations 22?500 22.500 <br />945003 Annual Rcsuffaning Various City Su~ts 306,168 306~i68 <br />945004 Annual Slun~/Seal Pmjcct 91~176 91t!76 <br />945005 Annual Traffic Loop/Pavement Replacement 0 <br />945006 Annual Su~et Lighting Upgrade 0 <br />945007 Annual Traffic Button and Line Matkcts 43r046 43r046 <br />945013 Annual Sucet Tree Planting 0 <br />945029 Extension of Junipeto Street 848?702 848,702 <br />945030 Internally Hluminated Strut Signs 0 <br />945031 Installation of New Sidewalks 107620 107620 <br />945032 Vineyard Avenue Soundwall 45,000 45?000 <br />945033 New Stoma Drain on Abbic St & Angela St (1 st St- 3rd St) 53.000 <br />945034 Arroyo Mocho Slope Repain at Hopyard Bridge 93.508 58?840 152r348 <br />941000 Annual Water Main Rcplac,~ment 0 <br />955003 Annual Resuffacing Various City Su~.ts 513,500 513,500 <br />955026 Resurface Stonet~dgc Dr. in Hacienda Business Park 584,753 (58~0001 526r753 <br />955004 Annual Slun~ Seal Project 65,000 <br />955005 Annual Traffic Loop/pavemont t~placemont 20r000 20v000 <br />955006 Annual Sifter Light Upgrade 10,000 <br />955007 Annual Traffic Button and Line market 25,000 25~000 <br />955027 Installation of New Sidewalks &Handicap Ramps 70,000 <57550' 64?450 <br />955028 ]3Taina~ffe ImprOvements at Nenl Street and Railroad Sheet 107000 10r000 <br />965020 Pleasantma Ave Reconsu' (Rose Ave - St John (~ UPRR) 1996-97 0 <br />965019 traffic Signal interconnect; Boreal at independence (1996-97) 0 <br />965021 jBridge Painting (1996-97) 0 <br />965015 [nternntly IlJnminated Street Signs (1996-97) 0 <br /> rS: Valley Ave & Paseo Santa Cruz/Via de Los Mila~ros (1997-98) 0 <br /> Stanely Blvd Improve :East of California St to Reflections (1999-00) 0 <br />955055 Bertant Ave (~ Miradot- left turn lane 25,000 25~000. <br />955054 Hopyard Median/Par~ Renotvation 41,250 41~250! <br /> Pafiial Funding From Outside Seur~es <br />945036 imam Rjta Rd Resurfacmg (R. oscwood - W. Las Positas) 192,975 1927975 <br />945037 Rose Avenue Reconstrucrion (Pleasanton Ave to Fair St) 607~400 52~288 659?688 <br />945008 Annual Handicap Ramp Insudinflon 51.668 5,550 57~218 <br />945057 Hopyard Rd Resurfacing (Stoneridge Dr. to N. of Owens) 381,300 [ 381~300 <br />955029 First Slreet Bridge at Affoyo Del Vaile; interim Improvements 155,9001 155,900 <br />965022 Hopyard Rd Re. surfacing; Stonerdigc Dr. Arroyo Mocho (1996-97) 0 <br /> 100% Funding From Otmide Sources <br /> Stoeeridge Drive at Santo Rita Improvements 175,000 1757000 <br /> Santa Rita at Valley; Int~r3eatiun Improv~nonts (1996-97) 0 <br /> Hopyard Road at Owens Drive Channelization (1996-97) 0 <br /> Extension of Livingston Way (1998-99) t 0 <br /> STREET PROJECT TOTAL $2i~99, t03 $2,T3~I~.~ iii ii~=~Z~840!~=i i~.~:i=$O ~i~iiif~L~7~aZ2 <br /> <br /> <br />