My WebLink
|
Help
|
About
|
Sign Out
RES 98086
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1990-1999
>
1998
>
RES 98086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2012 4:52:21 PM
Creation date
1/11/1999 5:37:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Removal of aboveground or underground fuel tanks is required in accordance with the require- <br /> ments of the Livermore-Pleasanton Fire Department, if these are to be removed as pan of devel- <br /> opment under the Specific Plan. <br /> <br /> Timing: Prior to commencetnent of development activi.ty on each applicable site. <br /> <br />18. Demolition of structures is required in accordance with applicable requirements of the California <br /> Department of Industrial Relations (Cal/OSHA)3 for lead, with appropriate follow-up measures if <br /> lead-based paint is found. <br /> <br /> Timing: In conjunction with and following development activity on each applicable site. <br /> <br />I9. Demolition of structures is required in accordance with the requirements of Cal/OSHA and the Bay <br /> Area Air Quality Management District (BAAQMD) for asbestos, with appropriate follow-up meas- <br /> ures if asbestos is found. <br /> <br /> Timing: In conjunction with and following development activity on each applicable site. <br /> <br />I 10. Notification of the Underground Service Alert (USA) as well as site tenants is required prior to <br /> groundbreaking, to obtain information on the existing location of underground utilities. <br /> <br /> Timing: Prior to groundbreaking on each deve~pment site. <br /> <br /> I11. Contact with the Alameda County Mosquito Abatement District is required for assistance in con- <br /> trolling and managing potential disease-bearing vectors and their breeding areas (e.g., lakes, <br /> detention basins, spnngs), to reduce the potential for transmission of public health diseases assogi- <br /> ated with these organisms. <br /> <br /> Timing: Prior to issuance of a grading permit on each applicable site. <br /> <br />J. BIOLOGY <br /> <br /> Requirements of the Specific Plan <br /> <br /> J1. A California Tiger Salamander Mitigation and Monitoring Plan must be prepared and submitted to <br /> the California Depamnent of Fish and Game (DFG) for review and approval. Approval of the plan <br /> must be obtained from DFG. <br /> <br /> Timing: Prior to the issuance of any grading permits that affect tiger salamander habitat. <br /> <br /> 3 <br /> The California Occupational Health and Safety Act (Cal/OSHA) is administered by the State Depadm~'nt of <br /> lmdustnal Rehtions, Division of Occupational Health and Safety. <br /> <br /> 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.