Laserfiche WebLink
PART I. <br /> <br /> MOLLER RANCH GEOLOGIC HAZARD ABATEMENT DISTRICT <br /> PROJECTED BUDGET <br /> 1998-99 FISCAL YEAR <br /> <br />A. PROIECTED INCOME <br /> <br /> Annual Income: 99 Single-Family <br /> Residential Lots @ $74.00 $7,326.00 <br /> <br /> Moller Ranch Reservoir $ 74.00 <br /> <br /> Remaining Parcels $ 0.00 <br /> (A,B,C,D,E,F,G,&H) <br /> <br /> TOTAL: $7,400.00 <br />B. PROIECTED EXPENSES <br /> <br /> 1. Geologic and/or Geotechnical <br /> Engineering Consultant <br /> (as per Plan of Control) $2,000.00 <br /> <br /> 2. Repair, maintenance and improvements <br /> (as per Plan of Control) $3,000.00 <br /> <br /> 3. city Review and Inspection $800.00 <br /> 4. Administration $600.00 <br /> 5. Reserve $1,000.00 <br /> TOTAL $7..400.00 <br /> <br />c. ASSESSMENT: Rate per Single Family <br /> Residential Lot/Reservoir $74.00 <br /> <br /> <br />