Laserfiche WebLink
I 5.2.4 Modifications and upgrades to the pump control system at the Oro <br /> 2 Loma Pump Station . <br /> 3 5.2.5 Installation of a stand-by diesel generator at the San Leandro Pump <br /> <br /> 4 Station ' - <br /> <br /> 5 5.3 The fees described in 5.~ and 5.2 above, shall accrue interest"t8 protect <br /> 6 against inflation, as described in Exhibit 'B', attached hereto and made a part hereof as <br /> 7 though fully set forth herein. The annual interest rate applied shall not be less that 3% <br /> 8 per annum, nor more than 6%. <br /> <br /> 9 6. Peak Wet Weather Flow <br /> <br />10 6.1 It is recognized by the parties that LAVWMA is still in the planning and <br /> <br />11 design stages of its expansion project. Currently the PWWF is anticipated to be <br />12 approximately 41.2 MGD, subject to environmental review and engineering analysis. <br />13 6.2 Should LAVWMA's planning and design process rasuit in a request for a <br />14 PWWF figure other than 41.2 MGD, then the table in Paragraph 3 of Exhibit "A" shall be <br />15 revised accordingly. ~~ <br />16 "~"~""~"""'~'~~~1~. The maximum PWWF for each five year time period shall be <br />17 equally proportioned between 21.00 MGD and the new maximum PWWF requested. The <br />18 formulas in Paragraph 3 of Exhibit 'A' for fixed cost percentage shall apply, including the <br />19 formula in Paragraph 3.5 for the new discount rate. <br /> <br />20 7. Operation of System. <br /> <br />21 7:1 Both parties shall operate and maintain their respective systems so as not <br /> <br />22 to damage the other party's system. <br /> <br /> EtIDA/LAVWMA 199~-.... Agreement, 7 PeDruary 18, 1998 <br /> <br /> <br />