Laserfiche WebLink
1 not claim any right to any capacity above the currently specified additional interruptible <br /> 2 capacity of 20.2 MGD unless ~~~!~iii~~!~iii!i~~ th~c A.G rcc,',,cnt is <br /> 3 modified by the parties pursuant to Paragraph 6-_I-. <br /> <br /> 4 2. Construction of LAVWMA Export Expansion Project. , <br /> <br /> 5 2.1 EBDA agrees that a new pipeline constructed as part of the F. AVWMA <br /> <br />6 Export Expansion Project may be connected to EBDA's system, provided however, that <br />7 EBDA staff shall review and concur in the design to insure its compatibility with the <br />8 Authority's forcemain and outfall system. LAVWMA shall have sole discretion to <br />9 determine the size and wet weather pumping capacity of the Export Expansion 8yetera <br />10 ~. 3. LAVWMA Participation in EBDA Operation, Maintenance, and Special <br />11 Study Costs <br />12' 3.1 LAVWMA shall participate in all costs of the Authority, except those <br />13 specffica!ly associated with the pump stations at Alvarado and Hayward, and the <br />14 forcemain from Alvarado to Oro Loma. <br />15 3.2 Said costs shall include the following: operation, maintenance, <br />16 administration, studies, reports, and renewal and replacement of equipment. <br />17 3.3 Certain costs shall be allocated on a case by case basis subject to the <br />18 Agreement of EBDA and LAVWMA. <br />19 3.4 LAVWMA cost sharing shall be as identified in Exhibit 'A', attached hereto <br />20 and made a part hereof as though fully set forth herein. <br /> <br />21 4. LAVWMA ParJicipation in Capital Project Costs <br /> <br />22 4.1 LAVWMA is responsible for its share of costs for any capital project that is <br /> <br />23 to replace and/or repair all EBDA facilities except the Alvarado and Hayward pump <br />24 stations, and the forcemain from Alvarado to Oro Loma. <br /> <br /> I:UDA/LAVVVMA 1'~ Agreement, 5 February 18. 1998 <br /> <br /> <br />