Laserfiche WebLink
- ENGEO <br />I N C 0 4 V O R A! E D <br />geologic hazard occurs and the funds then held in reserve by the GHAD are not sufficient to <br />address it. <br />Development of a Plan of Control prepared by a State Certified Engineering Geologist is a <br />requirement for formation of a GRAD. Pursuant to Public Resources Code Section 26509, a <br />Plan of Control must describe in detail the geologic hazard(s) to be addressed by the GHAD, the <br />location(s) of the geologic hazard(s), the area(s) affected by the geologic hazard(s), and a plan <br />for the prevention, mitigation, abatement, or control of those geologic hazards. <br />This Plan of Control for the Laurel Creek Estates GHAD describes the specific geologic hazards <br />to be addressed by the GRAD and the proposed GHAD activities intended to prevent, mitigate <br />and control those hazards. <br />4291-W2 <br />July 17, 1997 <br />Revised October 9, 1997 <br />Revised October 22, 1997 ? <br />