Laserfiche WebLink
PART I. <br /> <br /> OAK TREE FARM GEOLOGIC HAZARD ABATEMENT DISTRICT <br /> PROJECTED BUDGET <br /> 1997-98 FISCAL YEAR <br /> <br />A. PROJECTED INCOME <br /> <br /> Annual Income: 38 Single-Family <br /> Residential Lots @ $192.31 -- e7,307.78 <br /> <br /> City sanitary sewer pump <br /> station site @ $192.31 = $192.31 <br /> <br /> Remaining Parcel $00.00 <br /> (Parcel B, Parcel Map 6359) <br /> <br /> TOTAL: ~,7,aSD4;Z~ <br />B. PROJECTED EXPENSES <br /> <br /> 1. Geologic and/or Geotechnicai <br /> · Engineering Consultant <br /> (as per Plan of Control) $1,300.00 <br /> <br /> 2. Repair, maintenance and <br /> (as per Plan of Control) $3,600.00 <br /> <br /> 3. City Review and Inspection $1,000.00 <br /> 4. Administration $600.00 <br /> 5. Reserve ~ 1,000.00 <br /> TOTAL ~ <br /> <br />C. ASSi~SSMENT <br /> <br /> Rate per Single Family <br /> Residential Lot/Sewer <br /> Pump Station Site <br /> <br /> <br />