Laserfiche WebLink
Federal Grants <br />This yeats program includes $2,122,011 in grants from the Federal Intermodal Surface <br />Transportation Efficiency Act 0STEA). This funding is proposed to be used as follows: <br /> <br /> YEAR PROJECT AMOUNT <br /> II <br /> FY 1997/98 First Street Bridge at Arroyo Del Vaile S 1,197,65 I <br /> FY 1999/00 Santa Rim Rmd Restwfacing (Old Santo Rim to Sttmet/dge) 469,740 <br /> FY 200 i/02 Santo Rim Road Rmtufacing (Storeridge Drive to Mohr Avenue) 4fi4,620 <br /> <br />Contributions from the Sewer and Water Operation Fund <br />In recent ymu~ the City has adjusted sewer and water rates in part to establish a rote component for <br />sewer and water replacement and improvement projects. <br />To reflect the establishment of the Water and Sewer Replacement Funds, the Water and Sewer <br />projects. Expansion projects are those funded by connection fees while replacements and <br />improvements are funded by the replacement component of water and sewer rates. These funds are <br />not transferable between each other. The water and sewer replacement and improvement accruais, <br />which are revenue transferred from the Water and Sewer Maintenance and Operation Funds to cover <br />the cost of replacement and improvement projects are estimated to be $10,772,000 and $3,914,000 <br />respectively over the tenn of this program for a total of $14,686,000. The Maintenance and <br />Operation Funds are expected to contribute $3,128,412 and $1,773,108 to cover the Water and <br />Sewer Replacement share of lease payments. <br />Transfers from the General Fund <br />The program includes a net 'transfer of approxlr--,--!y $1 ,~88,500 from the General Fund during Fir <br />1997/98 and $1,365,000 in FY 1998/99 of the program. A total of $6,874,000 is estimated for all <br />five years of the program. These funds will be used to pay for a variety of projects, including the <br />replacement and addition of equipment and debt service payments and is generally used to pay for <br />the replacement and improvement portion of rniscellaneous projects. The expansion portion of these <br />projects is paid for with development revenue. A distribution of Cgncral Fund contributions over the <br />five years of the program is as follows. <br />GENERAL FUND CONTRIBUTIONS <br />I <br />i $1,388,506 $1,364,959 Sl,373,500 Sl,373,500 $1,373,500 S6,873,965 <br />It should also be noted that projects determined to be scheduled routine replacement, i.e., trucks, <br />vehicles and equipment and routine engineering studies which have traditionally been included in <br />his program, have been moved to the City's Operating Budget. This move allows for better tracking <br /> <br /> 8 <br /> <br /> <br />