My WebLink
|
Help
|
About
|
Sign Out
PC 2005-54
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2005
>
PC 2005-54
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:36:58 PM
Creation date
3/6/2006 3:48:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/16/2005
DOCUMENT NO
PC 2005-54
DOCUMENT NAME
PDR-421
NOTES
KEON YOUNG LEE
NOTES 3
COMM DEVELOPMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the building developer to ensure. that the project landscape contractor is award o£, and <br />adheres to, the approved landscape; and irrigation plans. Prior approval fron~a the Planning <br />Department must be received before any changes arc constituted in site design, grading, <br />building design, building colors or materials, landscape material, etc-. <br />>7. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the. Building Dc=partrrrent will issue permits. <br />~8. "I'he proj act developer shall submit a building survey and/or record o£survey and a site <br />devcloparient plan in accordance with the provisions of Chapter 18.68 of the Mw~icipal <br />Code o£the City o£Yleasanton. "These plans shall be approved by the Director of <br />Building Inspection prior to the issuance of a building pennit_ The site development plan <br />shall include all required infortrtatioan to design grad construct site, grading, paving, <br />drainage, and utilities. Specific items to be indicated on the site development plan <br />necessary to constrict the in~aprcavea~-amts arc to Y>c in accord anec with the City o£ <br />Pleasanton Private Developnnent Design Guidelines adopted April 15, 198E_ <br />39. A sanitary sewer-sampling matnhole shall be provided on each of the sanitary sewer <br />lateral ti-o era each building, unless otherwise waived by the Director of Building <br />Inspection. <br />40. All retaining walls higher than tour-feet Isom the top of the wall to the bottom ot- the <br />footway shall be constructed of rein£o reed concrete or shall be an approved crib wall <br />type. Calculations signed by a registered civil engineer shall accompany the wall plans- <br />41 . "fhc prof act developer shall submit two copies of the site soils report to the Director of <br />Building Inspection for third. party peer review and shall pay for such review at the time <br />specified by the Director. but in all cases before the issuance o£ a gradiang permit <br />42. The soils engineer shall certify the pad compactions o£all lots containing fill to the <br />satisfaction of the Director of Building Inspection prior to the issuance of building <br />permits- <br />Construction Requirements- <br />43. All site irraprovements and house. construction activities shall be. limited to the hours o£ <br />K=00 a. nz_ Lo 5=00 p.xTa_, Monday through Saturday- All construction equiparaeait nlusl nzccl <br />Dcpartnient of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. <br />44. At no time shall campers, trailers, motor homes, or ax~y other vehicle be used as living or <br />sleeping quarters on the construction site. Al] such vehicles shall be removed £roari llzc <br />site at the end of-each workday. A construction trailer shall be allowed to be placed on <br />the project site for daily administration/coordination purposes during the construction <br />period. <br />F <br />
The URL can be used to link to this page
Your browser does not support the video tag.