Laserfiche WebLink
95. Prior to the recording of the Final Map, the applicant shall pursue acquisition of the <br />approxitraata 20-Foot by 20-foot parcel at the wasLera~ and of the prof act. 12egardlass of <br />the status of the ownership ofthe remnant parcel, the applicant shall construct, install, <br />and improve all street improvements including in$astructure, off-site, landscaping, and <br />irrigation up to the most westerly botandary of the remnant parcel. <br />9Ei_ With the final Map, the developer shall dedicate a public trail aasenicxit over the property <br />to the north of Street I3 to be maintained by the honiaowners association including <br />landscaping, irrigation, and tcncing. <br />Storrrawatar Desif=n Eteuuire n~cnts <br />97. The project shall comply with the Alameda Countywide NPDES Permit #CA50029831, a <br />copy of which is av ailablo at the City oft-teas- <br />923. The project developer shall submit a final grading and drainage plan prepared by a <br />licensed civil enginee=r depicting all final grades and on-site drainage control measures <br />including bio-swalcs. Irrigated bio-swalas shall be redesigned as needed to the <br />satisfaction of the City Engineer to optimize the amount of the storm water running off <br />the paved surface that enters the bio-Swale at its most upstream and. This plan shall be <br />subject to the review and approval of the City Engineer prior to the issuance of any <br />building permits- <br />99. In addition to natural controls, the project developer may be required to install a <br />s Lruct ural control, such as an oil/water separator, sand £ltar, or approved equal din iha <br />parking loth (on the sites) to intercept acid pre-treat storm water prior to reaching the storm <br />drain- The design, locations, aizd a Schad ule for maintaining the separator shall ba <br />subrrtitted to the CJity Engineer/Chief Building Official for review and approval prior to <br />issuances of building pernzits_ Tha structural control shall be cleaned at least twice a year <br />once in~xnediately prior to October 7 5 and once in January. The pro"fact developer shall <br />center into a maintenaraca ag roam ant for the oil/water saparator_ <br />1 00. "fhc project developer shall submit sizing designs criteria to treat stonrawater runoff at the <br />time of-plan subx~-aittal. <br />101. Landscaping shall be deli fined to mini n-iizc irrigation and runofF promote surface <br />infiltration where appropriztte, and minimize the use of fa rtilizcrs and pesticides that caaz <br />contribute to stormwatcr pollution. <br />a. Structures shall he designed to discourage the occurrence and entry ofi pests into <br />buildings, thus minimizing the need for pesticides- <br />b. Whore feast bla, landscaping shall be dcsigncd and operated to treat stormwater <br />rurac>ff_ h~a areas that provide detention of water, plants that are tolerant of <br />saturated soil conditions and prolonged exposures to water shall be specified. Soi] <br />shall be aanended as required. <br />73 <br />