Laserfiche WebLink
undergro and utilities, traffic control devices, landscaping., and automatic irrigation <br />systems. <br />80. The applicant shall dedicate the necessary right-of--way for the Rose Avenue extension to <br />the westerly boundary of the proposed development and n-aake the improvexraents to the <br />width~s~ axzd strati sections to the satisfaction of the City En ginaar. <br />81 . The applicant shall subn~xit a refundable crash bond titer ha and and erosion control prior to <br />issuance of an engineering or building permit. "11ie amount of this bond will be <br />detern~cined by the. City 1-?ngineer. <br />F32_ The haul route for all x-n ateri als to and Boni this dcvelopxraent shall be approved by the <br />City Engineer prior to the issuance of an encroachment perm it_ <br />83. 'The applicant shall include erosion control measures on the tinal grading playa, subject to <br />the approval of the City Engineer. The applicax~t is responsible for ensurix~g that the <br />contractor is aware of such measures- All cut-and-fill slopes shall he rcvcgatated and <br />stabilized as soon as possible after cone pl etion of grading, in xio cast later than <br />October 15. No grading shall occur between October 7 5 and April 15 unless approved <br />erosion control measures arc in place., suY~ject to the approval of the Building and Safety <br />iii vision. Such xr~easures shall be maintained until such time as permanent landscaping is <br />in place- <br />t34. The applicant shall subxrait a dust control plan or procedure as part of the improvement <br />plans. <br />85. "fhe design of the water supply and sanitary sewer systems shall be subject to the review <br />and approval of the City Tngineer. <br />86_ Any damage to existing street improvements during construction on the subject property <br />shall be repaired to the satisfaction of the City Engineer at the full cxpcn sc to the <br />applicant. "Phis shall include slurry seal, overlay, or street reconstruction if deemed <br />warranted by the City Engineer. Yeters Avenue or the development side of the street <br />front St. John Street to St_ Mary Street shall be overlaid or slurry sealed at the City <br />Engineer's discretion. <br />237_ "l~ha applicacrt's contractor~s~ shall obtain an ancro achczsant parch it from the City k-~ng[naar <br />prior to moving any construction equipment onto the site. <br />f38. Bulk construction materials stored outdoors that may contribute to the pollution of storm <br />water runoff shall be covered as required by the City i-~'nginecr aa~d/or the Chief Building <br />Ofifii cial. <br />71 <br />