Laserfiche WebLink
shall be posted prohibiti ng the dumping of hazardous materials into the sanitary sewer- The <br />project developer shall nobly the Dublin-San Ran~ton Services Uisiri ct <USKSU) upon <br />installation of ilze sanitary connection; a copy of this notil3cation shall be provided to the <br />Planning Department. <br />f. Prior to grading perm it issuance the prof act developer shall submit a copy of the State Water <br />Kesources Control Board Notice of Intent (NOl) for coverage under the State Construction <br />Storm Water General Permit for projects with clearing, grading and excavation exceeding the <br />currctit standards. <br />g. All n~ctal. roofs shall be 15nished with rust-inhibitive paint- <br />h_ Roof drains shall discharge and drain away froirt the building t~~unctation to an unpaved area <br />wherever practicable- <br />Storniwater Construction Rea uirements <br />6K. The project development shalt submit a Stormwatcr Yoliution Prevention Plan (SWPPP for <br />review and approval by the City 1~;ngineer prior to issuance of building or grading permits. <br />Failure to comply with the approved construction SWPPP may result in the issuance of <br />correction notices. citations or stop work order. The following construction Best Man agen~ent <br />Practical ~BMPs~, as well as any other applicable measure, shall he included in the SWPPP and <br />in~plen-iexrted as approved by the City. <br />69. "fhe project developer is responsi ble for implementing the following measures during all <br />construction phases of the project: <br />a_ "I'hc project developer shall itielude erosion control/storm water quality x~ieasures on the 13na1 <br />grading plan which shall specircally address measures to prevent soil, dirt, and debris front <br />entering the storm drain systetr~. Such measures may include, but arc not lit~~ited to, <br />Hydro seeding, hay hales. sandbags, and siltation fences and are subject to the review and <br />approval of the City 1ngineer/Director of Building Inspection. 7f no grading, plan is required. <br />necessary erosion control/storm water quality measures shall be shown on the site plan <br />submitted for sites on-site permit, subject to the review and approval of the Director of <br />F3uildix~g Inspection- The project developer is responsible for en curing that the contractor is <br />aware o£ and iniplenienis such iricas urc-s_ <br />b. All cul and 1317. slopes shall be revegetated and stabilized aRer completion of grading, but in <br />no case later than October 15. Hydroseeding shall be accotrxplished before September 15 and <br />irrigated with a temporary irrigation system to ensure that the grasses are established before <br />October 1 S. No- grading shall occur between October 15 and April 1 5 unless approved <br />erosion control/Storm water quality measures are in place, subject to the approval of City <br />Engineer/C~irector of Building Inspection. Such n~eas cares shall be nz ai ntaincci until such time <br />as permanent landscaping is place- <br />c. Gather all construction debris on a regular basis and place it in a dumpster or other container <br />which is emptied or removed on a weekly basis. When appropriate, use tarps on the ground <br />to collect fallen debris or splatters that could contribute to storm water runoff pollution- <br />1 1 <br />