My WebLink
|
Help
|
About
|
Sign Out
PC 2005-15
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2005
>
PC 2005-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2007 4:29:35 PM
Creation date
3/1/2006 4:46:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/7/2005
DOCUMENT NO
PC 2005-15
DOCUMENT NAME
PDR-43
NOTES
PAUL BERCHEIM
NOTES 3
CONSTRUCT CUSTOM HOME
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
77I_ Revise plans to contain a grading and drainage plan per condition number <br />1 6(d~~7)_ <br />IV_ The xrtain structure shall be constructed to allow for Future installation of a <br />Photo Voltaic (PV) system_ The project/ building developer may either <br />coxr~ply with the following requirements for making all houses on the Lot <br />photovoltaic ready. Making the home photovoltaic ready shall require the <br />following measures to be ixrxplemented will-~ the construction of the <br />structures covered= <br />1J 731ecirical conduit and cable shall be installed from the roof7attic area <br />to the buildings' main electrical panels. <br />2) Roof trusses shall he engineered to 1-candle aii addition load of rve <br />(5) pounds per square foot beyond that of the anticipated load for the <br />roofing material. <br />3J An area shall be provided near the electrical panel for the "inverter" <br />required to convert the direct current output from the photovoltaic <br />panels to alternating current. <br />4) A bi-directional electrical x-neter shall be installed. <br />These measures shall be shown on the building permit plan set submitted to <br />the Planning Director For review and approval before issuance of the first <br />building permit. The project developer shall provide the future <br />homeowners the necessary information delineating the trxeans by which <br />photovoltaic panels can be applied to the roofs of the structures covered by <br />this approval_ This information shall be submitted tot the Planning <br />Director for review and approval prior to the occupancy of the trst unit. <br />{~ vid} <br />1 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.