Laserfiche WebLink
<br />105. All metal roofs shall be finished with rust-inhibitive paint. <br /> <br />106. Roof drains shall discharge and drain away from the building foundation to an <br />unpaved area wherever practicable. <br /> <br />Stormwater Construction Reauirements <br /> <br />107. The project development shall submit a Stormwater Pollution Prevention <br />Plan (SWPPP) for review and approval by the City Engineer prior to issuance of <br />building or grading permits. Failure to comply with the approved construction <br />SWPPP may result in the issuance of correction notices, citations, or stop work <br />order. The following construction Best Management Practices (BMPs), as well as <br />any other applicable measure, shall be included in the SWPPP and implemented as <br />approved by the City. <br /> <br />108. The project developer is responsible for implementing the following measures <br />during all construction phases of the project: <br /> <br />a. The project developer shall include erosion control/storm water quality <br />measures on the final grading plan which shall specifically address <br />measures to prevent soil, dirt, and debris from entering the storm drain <br />system. Such measures may include, but are not limited to, hydroseeding, <br />hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Chief Building Official. If no grading plan is <br />required, necessary erosion controUstorm water quality measures shall be <br />shown on the site plan submitted for an on-site permit, subject to the review <br />and approval of the Chief Building Official. The project developer is <br />responsible for ensuring that the contractor is aware of and implements <br />such measures. <br /> <br />b. All cut and fill slopes shall be revegetated and stabilized after completion <br />of grading, but in no case later than October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. No <br />grading shall occur between October 15 and April 15 unless approved <br />erosion control/storm water quality measures are in place, subject to the <br />approval of City Engineer/Chief Building Official. Such measures shall be <br />maintained until such time as permanent landscaping is place. <br /> <br />16 <br />