My WebLink
|
Help
|
About
|
Sign Out
SR 06:046
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2006 3:42:31 PM
Creation date
2/2/2006 3:27:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
2/7/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:046
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(*): SAMI = Stress Absorbing Membrane Interlayer (A superior system of pavement overlay that enhances <br />long-term durability of the pavement.) <br />OL = Overlay <br />(**): PCI = Pavement Condition Index (A Pavement Conditions Index rating of 26-49 is considered a "poor" <br />condition requiring a full pavement overlay.) <br /> <br />BUDGET <br /> <br />The fmal project funding and expenditures are presented below. <br /> <br />Funding <br />CIP No. 045003 <br /> <br />$2,900,000.00 <br /> <br />Expenditures <br />Construction Contract <br />Change Orders <br />Sub-total: <br /> <br />$1,416,564.40 <br />$130,451.15 <br />$1,547,015.55 <br /> <br />A net total contract change order of $130,451.15 (9.2% of the construction contract) was a <br />result of a net increase in the contract quantities and compensation to the contractor for <br />additional work performed. This is less than the 10% contingency approved by the City <br />Council with the award of the project. <br /> <br />Unexpended funds will be retained in the Annual Resurfacing Account for Project 045003RS <br />and for future annual street resurfacing projects. The project 045003RS, which was awarded <br />on August 16, 2005, is also complete and currently being processed for acceptance by the <br />City. <br /> <br />FISCAL IMPACT <br /> <br />This project is part of our ongoing maintenance efforts to replace deteriorated pavement <br />surfaces of City streets. It is anticipated that ongoing maintenance and replacement will <br />extend the useful life of the roadway system and reduce overall long-term replacement costs. <br /> <br />Respectfully submitted, <br /> <br />7<1. {;O~ <br /> <br />Rob Wilson <br />Director of Public Works <br /> <br />~~ /'~. <br /> <br /> <br />Susan Rossi <br />Director of Finance <br /> <br />Nelson Fialho <br />City Manager <br /> <br />SR 06:046 <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.