Laserfiche WebLink
<br />":r:.F 1': <br /> <br />--., .,- <br />--I '= <br /> <br />C t. .;gmt. :10. ';-1l79-C <br /> <br />shall be borne by CITY. CITY hereby acknowledges the receipt of <br />STATE's "Manual on High and Low Risk Underground Facilities <br /> <br />Within Highway Rights of Way". <br /> <br />(8) If additional right of way is required, to acquire <br />all necessary additional right of way that will permit full pos- <br />session and control of said right of way, and transfer it in fee <br />to STATE, at no cost to STATE, and SUbject to prior examination <br />and acceptance by STATE of the degree of title to be conveyed to <br /> <br />STATE. <br /> <br />Full possession and control shall be obtained prior to <br /> <br />the date or acceptance by the STATE of maintenance and operation <br /> <br /> <br />of the highway facility. <br /> <br /> <br />(9) If any existinq pUblic and/or private utilities <br /> <br /> <br />conflict with the construction of PROJECT, CITY will make all <br /> <br />necessary arrangements with the owners of such utilities for <br /> <br />their protection, relocation, or removal, and if there are costs <br /> <br />of such protection, relocation, or removal which STATE and/or <br /> <br />CITY must legally pay, CITY will bear the cost of said pro- <br /> <br />tection, reloca~ion, or removal, plus cost of engineering over- <br /> <br />head and inspection. If any protection, relocation, or removal <br /> <br />of utilities is required, such work will be performed in accord- <br /> <br />ance with STATE policy and procedure for those utilities within <br /> <br />STATE's existing or proposed right of way and in accordance with <br /> <br />CITY policy for those utilities outside STATE's existing or pro- <br /> <br />posed right of way. <br /> <br />(101 To furnish evidence to STATE, in a form accepta- <br /> <br />ble to STATE, that arrangements have been made for the pro- <br /> <br />-4- <br />