Laserfiche WebLink
<br />Lions Wayside Park <br />PI"asanton, CA <br /> <br />Preliminary <br />Opinion of Probable Construction Co,t, <br />SctlematicDe,ignS,age <br /> <br />12.16.05 <br /> <br />IV. Planting & Irrigation <br />A. Miscell. <br /> 1 Irrigation - Lawn 97.360 SF 1.25 121.700 <br /> 2 Soil Preparation 99,860 SF DAD 39,950 <br /> 3 lrrig. - Bubblers for all trees 190 EA 40.00 7,600 <br /> 4 Irrig. - Drip for Rose Garden 2,500 SF 1.50 12,500 <br /> 5 Irrig. - Grd Cover Areas 5,000 SF 2.50 12,500 <br /> ]94.250 <br />B. Planting <br /> 1 Lawn from Seed 97,360 SF 0.20 19,480 <br /> 2 Rose Garden 2,500 5F 5.00 12,500 <br /> 14,535 SF 31.980 <br />C. Planting - Trees <br /> 1 Trees - 84" Box 1 EA 6,500.00 6.500 <br /> 2 Trees - 48" Box 6 EA 1,500.00 9.000 <br /> 3 Trees - 36" Box IOEA 800.00 8.000 <br /> 4 Trees - 24" Box 40 EA 300.00 12,000 <br /> 5 Trees-15Gal. 130 EA 125.00 16,250 <br /> 187 51.150 <br />D. Planting - Shrubs & Vines <br /> I Vines-15 Gal. IOEA 100.00 1,000 <br /> 2 Shrubs -IS Gal. 40 EA 100.00 4,000 <br /> 3 Shrubs - 5 Gal. 40 LF 35.00 1,400 <br />4 Shrubs - 1 Gal. 100 EA 25.00 2,500 <br /> 190 8.900 <br /> Subtotal: Planting & Irrigation 286.880 <br /> Subtotal: I-IV 1.189.195 <br /> Contingency (25%) 297.300 <br /> Grand Total $ 1,486,495 <br /> See nelrtpagefornotes. <br /> <br />RichardursonA,sodate, <br />Landsc.peArchitecturePlanning <br />Page 3 <br />