Laserfiche WebLink
<br />Res~luti~n N~. PC-94-68 <br />Pag~ 10 <br /> <br />s. Engineering Require~ents <br /> <br />a. <br /> <br />Six: inch "V"ertica.l concrete curbs shall <br />bet~~~n all pa.~~d and landscaped a~~a~. <br /> <br />be <br /> <br />inst.alled <br /> <br />b. The pa~ing secti~ns for t.he on-site parking and dri~e <br />a.~eas ~ha.ll be desig~ed ~:n. the basi~ of an R-~al~e test <br />and a traffic i:n.d.ex t.o carry the ant.icipated traffic <br />loads. This design shall be sub~ect to the appr~"V"al ~f <br />the Di:recto~ of B~ilding Inspec:::ti~n. The minim~m pa~ing <br />~ec:::ti~n shall be 2-- A.C. on 6-- ~f A.B. The minimum A.C. <br />pa~ement slope shall be 1%. For pa"V"e.me.nt sl~pes of less <br />t.han 1%, the s~r-fa.c:::e r-unoff shall be c::::ar-r-ied in a <br />concrete gl...1tte.r to a:n. accepta.ble point of discharge. The <br />minimum sl~pe for concrete gutter shall be 0.5%. <br /> <br />A sanitary se~er sampling manhole shall be pro--v-ided on <br />the sanitary se.VtTer lateral from the b"l...1ilding, "U.nless <br />~the:r~ise VtTai~ed by the Director of B"l...1ilding Inspection. <br /> <br />d. The applicant shall sl...1bmit a final grading and drainage <br />pla:n. prepared by a licensed ci"V"il engineer depicting all <br />fina.l gra.des and on-site draina.ge cont:rol meas"U.res. This <br />plan shall be sub~ect t~ the re"V"ie~ and a.ppro~al of the <br />City Engineer and/or the Di:recto:r of Building Inspection <br />prior to the iss"U.ance of any b"U.ilding permits. <br /> <br />The a..pplic::::a..:n.t sha..ll sl...1bmit refl...1:n.cl.able c:::ash bo:n.cl. for <br />hazard a:n.d. erosion c~ntrol prior t~ issl...1a..nce of an <br />E:n.gineer-ing or- Build.i:n.g Department permit. The amount of <br />this bond ~ill be determined by the City Engineer. <br /> <br />f _ The hal...1l route for all materials to a.nd from this <br />de--v-elopme:n.t sha.ll be a.ppro~ed by the City Engineer- prior <br />to the issl...1ance of an encroachment permit. <br /> <br />g. The applicant shall incll...1de erosion control measu:res <br />the final grading pla.n, sl...1b~~ct t~ the a..ppro"V"al ~f the <br />city Engi:n.eer. The applic:::ant is responsible fo:r e:n.sl...1~i:n.g <br />that the c:::ontractor is a~are of such meas~res. All c:::"U.t <br />and fill slopes shall be re"V"egetated and stabilized as <br />soon a.s possible after completion of grading. No grading <br />shall occur betVoTeen October 15 a.:n.d. April 15 "l...1nless <br />a..ppro"V"ed erosion co:n.trol meaSl...1res are in plac:::e, sub~ect <br />to the appro"'Val of the B"l...1i lding De.partme.:n.t. S\...1ch <br />measures shall be. maintai:n.ed. \...1nt.il Sl...1ch time a.s perma.nent <br />landscaping is in plac:::e. <br /> <br />n. <br /> <br />The de"V"eloper shall submit a dust. <br />procedure VtTith the grading plan. <br /> <br />control <br /> <br />plan. <br /> <br />or <br /> <br />_...+Tm..~ -r- <br /> <br />.--r------;- <br />