Laserfiche WebLink
<br />Honorable Mayor and Members of the Council: <br /> <br />BACKGROUND <br />On July 19, 2005, Council awarded the construction contract for the subject project to the <br />lowest bidder, Rosas Brothers Construction, Inc., in the amount of $42,271.00. The subject <br />project has since been completed and is ready for acceptance. <br /> <br />Project No. 015031 was authorized under the 200112002 Capital Improvement Program. This <br />project is funded under the Pleasanton A venue Reconstruction Project from Rose A venue to <br />Division Street, CIP No. 015031. The Pleasanton Avenue Reconstruction project includes a <br />new street pavement section, curb, gutter, sidewalk, and landscaping. For cost savings, and <br />in order to minimize impacts to local residents, the Pleasanton Avenue Reconstruction Project <br />was divided into t"W'0 construction phases. <br /> <br />Phase I of the project consisted of the removal and replacement of 931 linear feet of damaged <br />concrete curb and gutter, 1609 square feet of concrete sidewalk and driveway approaches, and <br />two handicap access ramps. A total of four unhealthy trees were removed and replaced. <br /> <br />Phase II, roadway reconstruction, consisted of the removal and replacement of existing failed <br />pavement section. Phase II was combined with the Annual Street Resurfacing Project, CIP <br />No. 045003RS. The construction work for the Annual Resurfacing Project is about to be <br />completed and will be ready for acceptance in January, 2006. <br /> <br />BUDGET <br /> <br />The final project funding and expenditures are presented below. <br />in the FY 200112002 budget. <br /> <br />The project was authorized <br /> <br />Funding <br />Pleasanton Avenue Reconstruction, CIP No. 015031 <br /> <br />$315,000.00 <br /> <br />Expenditures <br />Construction Bid <br />Change Order <br />Miscellaneous (ads, tools) <br />Total Estimated Expenditures: <br /> <br />$42,271.00 <br />$9,294.00 <br />$518.00 <br />$52,083.00 <br /> <br />The total change order work in the amount of $9,294 (22%) was over the 20% contingency <br />limit of $8,454. This additional increase of $840 was a result of an increase in contract <br /> <br />SR:05:338 <br />Page 2 of 3 <br />