Laserfiche WebLink
<br />CITY OF PLEASANTON <br />VINEYARD & BERNAL AVENUES STREETSCAPE <br />NOVEMBER 17,2005 <br /> <br />O. SCOPE OF WORK <br /> <br />standard special provisions. Consultant shall prepare special provisions <br />in city format. In addition to special provisions for each item of work on <br />the plans, the special provisions will also include very specific <br />requirements for: <br /> <br />. Pedestrian Safety Plan, <br />. Bi-Monthly Utility Meetings Hosted by Contractor (with meeting <br />minutes), <br />. Notification of Adjacent Property Owners by Contractor, <br />. SWPPP & Bump's, <br />. Potholing Reports by Contractor <br />. Quality control surveying of curb forms, prior to pouring concrete <br />. Submittal of Survey Calks 3 days prior to each survey operation <br />. Aerial photo of site on monthly basis for construction documentation <br />(low cost photo) <br />Monthly safety meetings <br />Monthly safety audits <br /> <br />All of the above items would be added to the City standard special provisions, <br />after Section 21. <br /> <br />4.3. Construction Cost Estimates - CONSULTANT shall prepare <br />construction cost estimate based on 500/0 Plans. The Engineer's <br />Construction Cost Estimate shall be based on recent contract cost data <br />from appropriate industry publications, Caltrans Construction Cost Data, <br />the CONSULTANT's similar projects, or the City's similar projects. Items <br />shown in the cost estimate shall match items shown in the 500/0 <br />specifications bid form. <br /> <br />4.4. Quality Control Revievv - All team members will make resubmitted to <br />CONSULTANT one week prior to formal submittal. CONSULTANT and <br />the designated quality control engineer will review the plans for one week <br />to evaluate a) interfaces between design disciplines, b) plan sheet format, <br />c) completeness of submittal, d) dimensions and base file data, and e) <br />previous comments from stakeholders and City. <br /> <br />4.5. Team Meeting - The design team will assemble and each firm will <br />receive a compiled list of comments from the quality control engineer at <br />CONSULTANT. After design team reviews and agrees with the plan <br />comments, each team member will be responsible to track the quality <br />control comments. <br /> <br />4.6. Printing Submittal - Each team member will submit revised plans, <br />specifications, and estimate to CONSULTANT for printing. <br /> <br />~ <br /> <br />BELLECCI & ASSOCIATES. INC. <br /> <br />CIVIL HNG1Nl3BllDiG .. LAND PLAN'N1N"G .. LAND!k>1t.VEYINoG <br />