Laserfiche WebLink
<br />CITY OF PLEASANTON <br />VINEYARD TRAFFIC CIRCLES <br /> <br />EXHIBIT A: SCOPE OF WORK <br /> <br />CONSULTANT will attend review meeting with City staff to accelerate the <br />review process. <br /> <br />The CONSULTANT shall submit the 50% PS&E to the CITY for review <br />and comments. <br /> <br />Deliverables: <br />. Three (3) copies of 500/0 Plan Set <br />. Three (3) copies of 500/0 Project Special Provisions <br />. Three (3) copies of the 500/0 Cost Estimate <br /> <br />4. 950/0 PS&E <br /> <br />Following review of the 500/0 designs, final designs (95%,) will be prepared that <br />precisely layout the construction details for the projects. During the 950/0 design <br />phase, details will be finalized and the contract documents further developed. <br />Subtasks required for the development of the 950/0 package submittals are: <br /> <br />4.1. Plans I Response to 500/0 Revievv - CONSULTANT Team will prepare <br />950/0 plans based on the 500/0 comments from City review meeting <br /> <br />4.2. Technical Specifications - CONSULTANT shall revise technical special <br />provisions based on comments from 500/0 review meeting. <br /> <br />4.3. Construction Cost Estimate - CONSULTANT shall prepare construction <br />cost estimate based on 950/0 Plans. <br /> <br />4.4. Printing & Submittal - Each team member will submit revised plans, <br />specifications, and estimate with a quality control checklist to <br />CONSULTANT for printing. <br /> <br />5. 100% SUBMITTAL <br /> <br />5.1. Plans - Response to 950/0 Revievv - CONSULTANT Team will prepare <br />1000/0 plans based on the 950/0 comments from City review meeting <br /> <br />5.2. Technical Specifications - CONSULTANT shall revise technical special <br />provisions based on comments from 950/0 review meeting. <br /> <br />5.3. Construction Cost Estimate - CONSULTANT shall prepare construction <br />cost estimate based on 1000/0 Plans. <br /> <br />NOVEMBER 10, 2005 <br /> <br />BELLECCI & ASSOCIATES <br />