My WebLink
|
Help
|
About
|
Sign Out
SR 05:301 (2)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:301 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2005 3:53:30 PM
Creation date
10/28/2005 11:49:22 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
11/1/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:301(2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> 2.3 Design storm drain lines, streets, curbs and gutters, channels and culverts, and open spaces <br /> in a comprehensive manner such that no habitable buildings are subject to flooding during a <br /> 100-year storm event. <br /> Public Facilities Obiective <br /> TO MEET THE NEEDS OF THE PLANNING AREA FOR SOLID WASTE MANAGEMENT, <br /> ELECTRICITY, GAS AND TELECOMMUNICATIONS SERVICES. <br /> Utilities Policy 1: Solid Waste. Promote the reduction of solid waste through re-use, recycling, <br /> composting and other transformation of wastes. <br /> Utilities Policy 2: Electricity and Gas. Provide electrical, gas, and telecommunications services <br /> to new development in accordance with City standards. <br /> Utilities Policy 3: Energy Reduction. Reduce the energy needs of new development within the <br /> Planning Area by encouraging the use of passive heating and cooling in building design, and by <br /> constructing energy efficient structures. <br /> Guideline: <br /> 3.1 "Green Building" design should be incorporated into all development to reduce life cycle <br /> energy uses. <br /> Utilities Policy 4: Phasing. Phase the construction of utility systems (electrical, gas, <br /> communication systems) to ensure adequate public safety and to minimize short-term <br /> maintenance and operational difficulties. <br /> Administrative Draft, Bernal Property Phase II Specific Plan, October 25, 2005 Page 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.