Laserfiche WebLink
such vehicles shall be removed from the site ~/t the end of each work <br />day. <br /> <br />71. <br /> <br />Final inspection by the Planning Deparanent is required prior to <br />occupancy. <br /> <br />72. <br /> <br />If archeological materials are uncovered during grading, trenching, <br />or other on-site excavation, all work on site shall be stopped and the <br />City immediately notified. The county coroner and the Native <br />American Heritage Commission shall also be notified and <br />procedures followed as required in Appendix "K" of the California <br />Environmental Quality Act (CEQA). A similar note shall appear on <br />the improvement plans. <br /> <br />73. <br /> <br />Portable toilets used during construction shall be kept as far as <br />possible from existing residences and shall be emptied on a regular <br />basis as necessary to prevent odor. <br /> <br />74. <br /> <br />Except as otherwise specifically addressed in these conditions, the <br />conslmction stage mitigation measures included in Section IVF of <br />the Specific Plan (pp 48-56) shall be incorporated herein and shall be <br />followed as the project develops. <br /> <br />PoiJee Department Requirements <br /> <br />75. The area of the development shall be tested for strength and clarity <br /> of signal to and from the area for City emergency services <br /> communications including, but not limited to, City eight-hundred <br /> megahertz (800 mgh) trunked radio, Livermore-Pleasantun Fire <br /> Services radio, Alameda County eight-hundred megahertz (800 <br /> mgh) tnmked radio, CLEMAR/ Police Dispatch, and the current <br /> police mobile data system, unless waived by the Police Depa~h~tent, <br /> City of Pleasanton. Expert opinions may be required in anticipation <br /> of communications difficulties inside or around large structures. If <br /> less than acceptable eormnunications are found or are projected, the <br /> project developer shall submit a mitigation program, to the <br /> satisfaction of the Police Deparianent, prior to approval of the final <br /> map and shall complete the approved mitigation at its expense as <br /> part of the project's initial phase. <br /> <br />Fire,Department Requirements <br /> <br /> Comtitions of Approval for PUD-6, Centex Homes' Avignon Proj~t <br />City Council Meeting, June 5, 2001 - <br /> <br />Page 25 <br /> <br /> <br />