My WebLink
|
Help
|
About
|
Sign Out
ORD 1832
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1801 - 1900
>
ORD 1832
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:07 PM
Creation date
7/20/2001 4:25:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1832
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
slurry seal, overlay, or street reconstruction if deemed warranted by <br />the City Engineer. <br /> <br />115. <br /> <br />The project developers contractor(s) shall obtain an encroachment <br />permit from the City Engineer prior to moving any construction <br />equipment onto the site. <br /> <br />Urb~ Stormwater Runoff Requirements <br /> <br />116. <br /> <br />The project developer shall install a structural control(s), such as <br />oil/water separator(s), sand filter(s), or approved equal(s) on the site <br />to intercept and pretreat storm water prior to reaching the storm <br />drain. The design, locations, and a schedule for maintaining the <br />separator shall be submitted to the City Engineer/Director of <br />Building Inspection for review and approval prior to issuance of <br />building permits. The structural control shall be cleaned at least <br />twice a year: once immediately prior to October 15 and once in <br />January. The project developer shall enter into a maintenance <br />agreement for the oil/water separator. <br /> <br />117. <br /> <br />Bulk construction materials stored outdoors that may contribute to <br />the pollution of storm water runoff shall be covered as required by <br />the City Engineer and/or the Director of Building Inspection. <br /> <br />118. <br /> <br />The project developer shall label all on-site storm drain inlets with <br />the wording, "No Dumping -- Drains to Bay" using City-approved <br />methods and materials. On-site storm drain facilities shall be <br />cleaned a minimum of twice a year as follows: immediately prior to <br />October 15 and once in January. Additional cleaning may be <br />required if found necessary by the City Engineer/Director of <br />Building Inspection. <br /> <br />119. <br /> <br />Prior to the commencement of any clearing, grading, or excavation, <br />the project developer shall submit a copy of the State Water <br />Resources Control Board Notice of Intent (NOI) for coverage under <br />the State Construction Storm Water General Permit. <br /> <br />120. <br /> <br />All cut and fill slopes shall be revegetated and stabilized after <br />completion of grading before October 15. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary <br />irrigation system to ensure that the grasses are established before <br />October 15. No grading shall occur between October 15 and April <br />15 unless approved erosion control/storm water quality measures are <br /> <br />Conditions of Approval, PUD-5, Centex Homes' Apperson Ridge <br /> Page 30 <br /> <br />J~e5.2~l <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.