Laserfiche WebLink
12. <br /> <br />To improve emergency access, reciprocal access easements shall be granted <br />for EVA purposes over the Chrisman and Berlogar access roads, and a <br />connecting road from the unimproved road above the Berlogar vineyard to <br />the Chrisman driveway shall be constructed in conjunction with the <br />reconstruction of the Chrisman driveway. This EVA may be gated so long <br />as the Fire Depadment has satisfactory access. The location, width, and <br />surface of this road shall be generally shown on the tentative map, the <br />intention being to provide an all-weather, non-paved, surface capable of <br />providing interim emergency access. In addition, the Chrisman parcel shall <br />grant on the final map an offer of EVA access over the connecting roadway <br />to the Brozosky driveway, to be perfected at such time as the Brozosky <br />property subdivides and grants the Chrisman's a reciprocal EVA access <br />over the Brozosky driveway. This access shall also be shown on the <br />tentative map. <br /> <br />Project Phasing <br /> <br />13. <br /> <br />Any proposed phasing of this development shall be depicted on the <br />teatative map and shall include a narrative explaining any proposed <br />phasing. Unless a phasing plan for improvements is approved by the <br />Planning Director, the applicant shall complete all' of the on-site <br />improvements at one time. <br /> <br />14. <br /> <br />The preliminary design plans for the planned Old Vineyard Avenue public <br />u'ail shall be approved by the City Council before issuance of the first <br />building permit for this project. <br /> <br />15. <br /> <br />All off-site infrastructure improvements required by the Vineyard Avenue <br />Corridor Specific Plan for development of the project site shall be designed <br />and included in an approved improvement agreement prior to approval of <br />the in-tract final map. In addition, an improvement agreement for the <br />conslruction of the full loop road around the school site must also be in <br />place, whether as part of the project's improvement plans or in separate <br />agreements, prior to approval of the final map. <br /> <br />Local Worker Purchasing Incentive <br /> <br />16. <br /> <br />When the project developer is ready to sell the first phase of residential <br />units, the project developer shall undertake a marketing campaign targeted <br />at persons who work within the City of Pleasanton. This campaign may <br />include, but is not limited to: <br /> <br />Condilions of Approval, PUD-5, Centex Homes' Apperson Ridge June 5.2001 <br /> Page 11 <br /> <br /> <br />