My WebLink
|
Help
|
About
|
Sign Out
ORD 1926
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:46 PM
Creation date
10/20/2005 4:24:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2005
DOCUMENT NO
ORD 1926
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e. Prior to grading permit issuance the project developer shall submit a copy of <br />the State Water Resources Control Board Notice of Intent (NOI) for coverage <br />under the State Construction Storm Water General Permit for projects with <br />clearing, grading and excavation exceeding the current standards. <br /> <br />f. Roof drains shall discharge and drain away from the building foundation to an <br />unpaved area wherever practicable. <br /> <br />Stormwater Construction Requirements <br /> <br />The project development shall submit a Stormwater Pollution Prevention Plan <br />(SWPP) for review and approval by the City Engineer prior to issuance of building or <br />grading permits. Failure to comply with the approved construction SWPPP may <br />result in the issuance of correction notices, citations or stop work order. The <br />following construction Best Management Practices (BMPs), as well as any other <br />applicable measure, shall be included in the SWPPP and implemented as approved by <br />the City. <br /> <br />The project developer is responsible for implementing the following measures during <br />all construction phases of the project: <br /> <br />Stormwater Ooeration Requirements <br /> <br />All projects, unless otherwise determined by the City Engineer or Chief Building <br />Official, shall enter into a recorded Stormwater Treatment Measures Inspection and <br />Maintenance Agreement for ongoing maintenance and reporting of required <br />stormwater measures. These measures may include, but are not limited to: <br /> <br />a. A mechanism shall be created, such as a property owners' association, to be <br />responsible for maintaining all private streets, private utilities and other <br />privately owned common areas and facilities on the site including stormwater <br />treatment measures. These maintenance responsibilities shall include <br />implementing the maintenance plan, which is attached to the Stormwater <br />Treament Measures Inspection and Maintenance Agreement. This document <br />shall be reviewed by the City Attorney's Office and recorded with the final <br />map. <br /> <br />b. On-site storm drain inlets clearly marked and maintained with the words "No <br />Dumping - Drains to Bay." <br /> <br />c. Proper maintenance of landscaping, with minimal pesticide and fertilizer use. <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.