My WebLink
|
Help
|
About
|
Sign Out
SR 05:293
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2005 3:02:51 PM
Creation date
10/13/2005 2:48:08 PM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
10/18/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:293
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />issue of the roundabouts needs to be revisited if for any reason the school is not built at this <br />location. <br />FISCAL IMPACTS <br />Building the traffic signal at the trail crossing will cost up to $150,000 with much of that cost <br />born by Specific Plan landowners and developers. Replacing the roundabouts with paved road <br />and stop signs will cost $180,000. The cost of replacing the roundabouts with a paved road <br />and signals will cost between $400,000 and $500,000. Both of these last two options will <br />have added costs if the school is built. Funding has not been allocated for this project. If City <br />Council decides to proceed with removing the roundabouts, staff will return with a future <br />report providing funding options. <br />Respectfully Submitted, <br />7?,( --;::;J ~ _ ~~~ ~ <br />Rob Wilson Susan Rossi Nelson Fialho <br />Director of Public Works Director of Finance City Manager <br />Attachments: Staff Report July 17, 2001 <br />SR:05:293 <br />Page 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.