Laserfiche WebLink
75. Any damage to existing sweet improvements during construction on the subject <br /> property. shall be repaired to the satisfaction of the City Engineer at full expense to the <br /> developer. This shall include sturry seal. overlay. Or street reconstruction if deemed <br /> warranted by the City. En~neer. <br /> <br />76. Electric power distribution. gas distribution. communication sen'ice. Cable television. <br /> and any required alarm systems shall be installed underground in a .joint utility trench <br /> unless otherxvise specificall>, approved by the City Engineer or Director of Btlildino_ <br /> Inspection for on-site. ~ <br /> <br />77. The appticant's contractons) shall obtain an encroachment permit from the City <br /> Engineer prior to moving any construction equipment onto the site. <br /> <br />78. The applicant shall comply with the City's non-point storm drain ordinance. <br /> <br />79. Prior to commencement of any clearing. grading, or excavation. the applicant shall <br /> submit to the Planning Department a copy of the State Water Resources Control <br /> Board Notice of Intent (NOD for coverage under the State Construction Storm Water <br /> General Permit. <br /> <br />Urban Runoff <br /> <br />80. The applicant shall submit a construction Best Management Practice (BMP) program <br /> for reviexv and approval by the Planning Director prior to issuance ofanv building <br /> and/or grading permits. These BMP's shall be implemented by the general contractor <br /> and all subcontractors and suppliers of materials and equipment. Construction site <br /> cleanup and control of construction debris shall also be addressed in this program. <br /> Failure to comply with the approved construction BMP may result in the issuance of <br /> correction notices. citations. or a project stop ~vork order. <br /> <br />81. The applicant shall a structural control, such as an oil/water separator. sand filter. or <br /> approved equal in the parking lot to intercept and pretreat storm water prior to <br /> reaching the storm drain. The designs. locations. and schedule for maintaining the <br /> separator shall be submined to the City Engineer/Director of Building Inspection for <br /> review and approval prior to issuance of building permits. The structural control shall <br /> be cleaned at least twice a >'ear: once immediately prior to October 15 and once in <br /> January. The applicant shall enter into a maintenance agreement for the oil/water <br /> separator. <br /> <br />82. The trash enclosure areaIs) shall be completely covered. <br /> <br /> Page 12 <br />PUD-82-19-6M <br /> <br /> <br />