Laserfiche WebLink
any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding. <br /> <br /> d. Create a contained and covered area on the site for the storage of bags, <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain system <br /> through being windblown or in the event of a material spill. <br /> <br /> e. Never clean machinery, equipment, tools, brushes, or rinse containers into a <br /> street, gutter, or storm drain. Ensure that concrete/gunite_supply trucks or <br /> concrete/plaster operations do not discharge wash water into street, gutters, <br /> or storm drains. <br /> <br />76.) The developer shall provide a cash bond for the future installation of a visual <br /> screen, which shall extend easterly from the proposed visual along the planter strip <br /> south of Rose Avenue. This shall be constructed once the remainder parcel is sold, <br /> if desired by the City at that time. The amount of the cash bond shall be reviewed <br /> and approved by the Planning Director prior to final map approval. If the City <br /> determines that a visual screen in this location is no longer necessary, then the <br /> cash bond will be refunded to the applicant. <br /> <br />77.) The applicant shall establish a homeowners maintenance association for the <br /> maintenance of the privately owned and landscaped areas, with the incorporation <br /> of the tree preservation measures included in the tree assessment and tree report. <br /> This association shall be structured so that as additional development occurs in the <br /> Rose Avenue area this development can be consolidated into the maintenance <br /> association. The general areas and the public access easements for the pocket park <br /> shall be defined with the tentative map. The specific details for the maintenance <br /> association shall be submitted to the City Attorney and Planning Director for <br /> review and approval prior to final map approval. <br /> <br />C:/cdpd05b.doc <br /> <br />PUD-99-05 Page 13 Planning Commission <br /> <br /> <br />