Laserfiche WebLink
avoid driving vehicles off paved areas. <br /> <br /> c. Broom sweep the public street pavement adjoining the project site on a daily <br /> basis. Caked-on mud or dirt shall be scraped from these areas before sweep- <br /> ing. <br /> <br /> d. Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain <br /> inlet nearest the downstream side of the project site in order to retain any de- <br /> bris or dirt flowing into the City storm drain system. Filter materials shall be <br /> maintained and/or replaced as necessary to ensure effectiveness and to pre- <br /> vent street flooding. Dispose of filter particles in the trash. <br /> <br /> e. Create a contained and covered area on the site for the storage of bags, ce- <br /> ment, paints, flammable, oils, fertilizers, pesticides, or any other materials <br /> used on the project site that have the potential for being discharged to the <br /> storm drain system through being windblown or in the event of a material <br /> spill. <br /> <br /> f. Never clean machinery, tools, brushes, etc., or rinse containers into a street, <br /> gutter, or storm drain. <br /> <br /> g. Ensure that concrete/gunite supply trucks or concrete/plasterers operations do <br /> not discharge wash water into street gutters or drains. <br /> <br /> h. Construction access routes shall be limited to those approved by the City En- <br /> gineer or Building Inspector and shall be shown on the approved grading <br /> plan. <br /> <br />123. In conjunction with the tentative map, the specific details for the driveway to the <br /> existing home shall be included for review and approval. <br /> <br />124. The existing home shall connect to the sewer system. Said connection shall occur <br /> prior to occupancy of any of the new homes. Specific details shall be shown on <br /> the final map improvement plans subject to review and approval of the City <br /> Engineer. <br /> <br />125. Access shall be maintained for the existing easement holders/homes at all times <br /> during the construction process. In the event that access is interrupted, all <br /> <br /> Page 21 <br /> <br /> <br />