My WebLink
|
Help
|
About
|
Sign Out
ORD 1790
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1701 - 1800
>
ORD 1790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:24:24 PM
Creation date
11/17/1999 10:28:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1790
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING <br /> <br />72. The developer shall comply with the recommendations of the geotechnical reports <br /> prepared by Terrasearch Inc. dated "November 9, 1998", "January 22, 1999", and <br /> "July 22, 1999" and the recommendations of the geotechnical peer reviewers, <br /> Alan Kropp and Associates and William Lettis and Associates Inc., all incorpo- <br /> rated herein by reference. If there are conflicting recommendations between that <br /> of Terrasearch and the peer reviewers, the peer reviewers' recommendations shall <br /> supersede the recommendations of the Terrasearch report. Similarly, if there are <br /> conflicting recommendations in one Terrasearch report and another, the recom- <br /> mendations of the later Terrasearch report shall supersede the earlier Terrasearch <br /> report. <br /> <br />73. The developer shall arrange and pay for Terrasearch and Allan Kropp and Associ- <br /> ates to inspect and approve all foundation, retaining, wall and drainage geotechni- <br /> cal aspects of project construction. A consultant from Terrasearch and Allan <br /> Kropp and Associates shall be present on site during grading and excavation op- <br /> erations as recommended by Allan Kropp and Associates. The results of the in- <br /> spections and the as-built conditions of the project shall be certified in writing by <br /> the geotechnical consultant for Terrasearch and Allan Kropp and Associates for <br /> conformance to the approved plans and geotechnical report and submitted to the <br /> City Engineer and Director of Building Inspection for review and approval prior to <br /> occupancy. <br /> <br />74. Prior to Tentative Map approval, the developer shall submit a detail of the pro- <br /> posed street lighting, including photometries, for the project. Design and location <br /> of the street lights shall be subject to the review and approval of the Planning Di- <br /> rector and City Engineer. The street lighting for the development shall be designed <br /> and located so as to minimize visibility from the valley floor to the greatest extent <br /> possible and shall be designed to have a country feeling, subject to the review and <br /> approval of the City Engineer and Planning Commission. Approval for the num- <br /> ber, location, and type of electroliers shall be subject to the review and approval of <br /> the City Engineer. <br /> <br />75. Lots above elevation 390 shall have individual hydromatic booster pumps for their <br /> water systems. Where feasible, the pumps shall be located in the garage of the <br /> dwelling unit. <br /> <br /> Page 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.