Laserfiche WebLink
49. The applicant shall grant an easement to the City over those parcels needed for <br /> public service easements (P.S.E.) and which are approved by the City Engineer or <br /> other easements which may be designated by the City Engineer. <br /> <br />50. The design for the line, grade, and structural sections for the streets serving this <br /> development shall be subject to final review and approval by the City Engineer. <br /> <br />51. All existing wells on the site shall be removed or sealed, filled and abandoned <br /> pursuant to Alameda County Ord. 73-68, prior to the start of grading operations <br /> unless Zone 7 retains specific wells for observation wells, or special approval is <br /> obtained from the City Engineer for temporary use of an existing well for <br /> construction water or for irrigation purposes. Any wells designated for <br /> abandonment or any wells, encountered during construction, are to be destroyed in <br /> accordance with a permit obtained from Zone 7. Any existing well that is kept for <br /> irrigation purposes shall be disconnected from the City's water system and fitted <br /> with backflow devices to the satisfaction of the City Engineer. <br /> <br />52. All existing septic tanks or holding tanks shall be removed or sealed, filled, and <br /> abandoned, pursuant to the requirements of the Alameda County Department of <br /> Health Services. <br /> <br />53. The haul route for all materials to and from this development shall be approved by <br /> the City Engineer prior to the issuance of an encroachment permit. <br /> <br />54. The applicant shall include erosion control measures on the final grading plan, <br /> subject to the approval of the City Engineer. The applicant is responsible for <br /> ensuring that the contractor is aware of such measures. All cut and fill slopes shall <br /> be revegetated and stabilized as soon as possible after completion of grading, in no <br /> case later than October 15. No grading shall occur between October 15 and April <br /> 15 unless approved erosion control measures are in place, subject to the approval <br /> of the Building Department. Such measures shall be maintained until such time as <br /> permanent landscaping is in place. <br /> <br />55. The developer shall submit a dust control plan or procedure as part of the <br /> improvement plans. Such plan shall be subject to the approval of the City <br /> Engineer and shall specifically address dust reduction to neighboring properties. <br /> <br />56. The design of the water supply and sanitary sewer systems shall be subject to the <br /> review and approval of the City Engineer. <br /> <br />PUD-99-02 City Council - Conditions of Approval Page 10 <br /> <br /> <br />