My WebLink
|
Help
|
About
|
Sign Out
SR 05:244
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2005 3:09:01 PM
Creation date
9/2/2005 3:06:25 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:244
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Policy 1: Preserve the character of existing residential neighborhoods. <br /> <br /> Program 1.1: Enforce the provisions of the City's Zoning Ordinance to maintain the <br /> character of existing residential neighborhoods. <br /> <br /> Program 1.2: Use the development review procedures to minimize intrusions, such as <br /> traffic and noise, into existing neighborhoods. <br /> <br />The proposed Phase I expansion conforms to the zoning requirements, in terms of setbacks, <br />building height, and parking, of the RM-2500 zoning district. The master expansion plan <br />(Phases II and III) also conforms to these zoning requirements. As proposed, adequate on-site <br />parking would be provided to minimize the tendency of using curbside parking on residential <br />streets. The master expansion plan shows that at the build-out, Valley Trails Drive would <br />remain the only access to and from the Church facility, thus preventing a direct access from the <br />subject site to National Park Road. Staff finds the proposed expansion would minimize intrusion <br />into the neighborhood. (Please refer to the following section on building layout/site plan, for <br />additional discussion on this issue.) <br /> <br />Staffbelieves that the site, in general, is properly maintained. With the conditions of approval, <br />improvements such as modifications to the existing fence at the preschool playground and <br />planting additional landscaping along National Park Road would enhance the current appearance <br />of the property. <br /> <br /> Building Layout/Site Plan <br /> <br /> The appellants believe the layout of the buildings should be in a linear form along National Park <br /> Road, that the northern parking lot should be eliminated, and that Phase II expansion should be <br /> scaled back to "the point where realistic parking capacity exists on the site without the use of <br /> neighborhood streets." The appellants have suggested locating the Phase I multi-purpose room <br /> to the north side of the existing building. The applicant has not agreed to this change since it <br /> would separate the multi-purpose room from the sanctuary, which the Church feels are <br /> functionally related. <br /> <br /> The proposed site plan is a result of several revisions based on neighborhood input and the <br /> operational needs of the Church. In addition to the neighborhood meetings, staffhas met with <br /> representatives of the congregation and the project architects in order to encourage a plan that <br /> would meet the present and future needs of the Church while minimizing neighborhood impacts. <br /> Staff believes that the proposed plan has been designed to meet the objectives of the <br /> congregation while m~mmxzmg the Church intrusion into the neighborhood. The appellants <br /> disagree and are of the opinion that the Church's expansion plans would create neighborhood <br /> impacts. <br /> <br /> SR:05:154 <br /> Page 6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.