My WebLink
|
Help
|
About
|
Sign Out
SR 05:241
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2005 11:45:51 AM
Creation date
9/1/2005 11:29:47 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/6/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:241
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Program Confirmation <br /> <br />The Task Force revisited and refined the anticipated programming for the Firehouse Arts Center, <br />previously identified during the development of the Do~vntown Parks and Trails Master Plan <br />and confirmed by the Downtown Specific Plan. The Task Force confirmed the following <br />program uses for the Center: <br /> <br /> · 250 seat theater with flexible seating - to be used for youth theater productions, chamber <br /> music, small dramatic productions, small musical concerts, lectures, literary events, <br /> film/video presentations, meetings, etc. <br /> · Art Gallery - designed to display all forms of fine art, including installations and video <br /> art. The gallery would be operated to support local arts organizations, its members, and <br /> would also display regional, state and national artists where appropriate. The gallery <br /> would be designed to achieve a reasonable level of museum/gallery accreditation, <br /> allowing the display of artwork with significant import and value. <br /> · Classrooms - to be used for multiple applications, including dedicated week-long (or <br /> longer) arts workshops, fine arts and crafts classes, rehearsals, meetings, lectures, etc. <br /> · Office space - to support facility staff. <br /> · Lobby space - to support both the theater and gallery. <br /> · Support facility for the theater - including dressing rooms and green room. <br /> · Restroom facilities - to support activities at the Center and potentially the Downtown <br /> area during regular operating hours of the facility. <br /> · Box Office - to support events at the Center and possibly serve as a central Box Office <br /> for community organizations and events. <br /> <br />During the course of discussions with the consultants, the Task Force also identified several <br />additional program elements: <br /> <br /> · Set support and preparation facilities for the theater. <br /> · Preparation and storage facilities for the Art Gallery. <br /> Downstairs office to acc~ommodate facility staff and Box Office operations. <br /> · Refreshment counter and facilities in the Lobby. <br /> · Enhanced size and utility of the Art Gallery. <br /> <br />Concept and Schematic Design <br /> <br />The Task Force, staff and project consultants reviewed a number of initial design approaches <br />which would adequately accommodate the identified program elements. The Task Force settled <br />quickly on a two-story approach, which would result in a facility offering approximately 18,000 <br />square feet of programming space. In the course of its various planning meetings, the Task <br />Force further refined the concept and schematic design, which is being presented for review this <br />evening. Particular emphasis was placed on achieving adequate gallery space and revealing as <br /> <br /> SR 05:241 <br /> Page 5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.