My WebLink
|
Help
|
About
|
Sign Out
SR 05:240
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2007 4:38:17 PM
Creation date
8/24/2005 4:39:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/30/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:240
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Year 2025 Alternative C) Pleasanton intersection and roadway capacity enhancements - Existing <br />+ Approved Pleasanton Land Development~ plus regional 2025 development with buildout of the <br />Livermore and Dublin General Plans. <br />This traffic forecast included all of the Group 3 changes at intersections to reduce congestion, and all of <br />the roadway widening and extensions. In additional, this traffic model forecast assumes the extension of <br />Stoneridge Drive to E1 Charro Road and the construction of the West Las Positas Interchange. <br /> <br />Additional 1996 General Plan Roadway Network changes assumed over the next 20 years in this <br />alternative traffic model run: <br /> <br />Roadway Projects: <br /> o Stoneridge Drive extension to E1 Charro Road as a 4-lane divided roadway <br /> o The Las Positas Boulevard Interchange at 1-680 <br /> o Important note: This model run does not assume the westbound 1-580 flyover to <br /> southbound 1-680. This project will likely eliminate some freeway connections at the <br /> Stoneridge Drive Interchange and would likely increase traffic using the interchange at <br /> West Las Positas Boulevard. <br /> <br />1996 General Plan Roadway Network changes NOT assumed over the next 20 years in this <br />alternative traffic model run: <br /> o Dublin Canyon Way - not widened to 4-lane divided road <br /> <br />Significant intersection changes: <br /> o Bernal Avenue at Vineyard/Tawny - Install protected/permissive north/south left turn <br /> <br /> o Hopyard Road at West Las Positas Boulevard - convert the # 1 northbound through lane <br /> into a third northbound left turn lane <br /> o Santa Rita Road at Stoneridge Drive - maintain the existing northbound double left turn <br /> and three through lanes, and convert the existing #1 eastbound right turn lane into a third <br /> through lane <br /> o Stoneridge Drive at West Las Positas Boulevard convert #3 northeast bound through <br /> lane into a right turn only lane <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.