Laserfiche WebLink
Proiect No. 045003RS (Resurfacing of Various City Streets) <br /> <br />Funding <br />CIP # 045003 (Gas Tax 8, Measure B) $ 2,000,000 <br />CIP # 035003 (Annual Resurfacing of Various City Streets <br /> FY 03/04 remaining) $ 903,000 <br />CIP #045003RF (Estimated Expenses) ($1,565,000) <br />Estimated Fund Balance: $1,338,000 <br /> <br />Estimated Expenditures <br />Construction Bid $ 778,985 <br />Construction Contingency (20%) $ 155,797 <br />Construction Services: $ 9,218 <br />Total Estimated Expenditures: $ 944,000 <br /> <br />Staff recommends that the construction contingency amount for this project be increased from <br />10% to 20% due to problems experienced on similar past projects when unstable subgrade <br />materials are encountered after the removal of asphalt concrete. The amount of subgrade <br />materials that are unsuitable and must be replaced with an additional 4" or 6" of asphalt <br />concrete cannot be accurately predetermined. Once the base is compacted, a geotechnical <br />consultant will review the condition of the soil and indicate to the City where additional <br />excavation of unsuitable material may be necessary. <br /> <br />Project No. 045004 ( Slurry Sealing of Various City Streets) <br /> <br />Funding <br />CIP No. 045004 (General Fund, Measure B) $120,000.00 <br /> CIP No. 035007 (Gas tax/Annual Traffic Buttons and Line Markers) $ 60,000.00 <br />CIP No. 045003 (Annual Resurfacing) $70,000.00 <br /> Total Funding: $250,000.00 <br /> <br />Estimated Expenditures <br />Construction Bid $224,985.41 <br />Construction Contingency (10%) $ 22,498.54 <br />Construction Services $ 2,516.05 <br /> Total Estimated Expenditures: $250,000.00 <br /> <br /> Included in this slurry seal project is slurry sealing of the Stoneridge Mall Road area. Traffic <br /> buttons and line markers within the Stoneridge Mall area was scheduled to be replaced as part <br /> of the Project No. 035007 (Annual Traffic Buttons and Line Marker Installation), but was <br /> combined with the subject project. Staff recommends that $60,000 from Project No. 035007 <br /> <br /> SR:05:217 <br /> Page 5 of 6 <br /> <br /> <br />