Laserfiche WebLink
PLEASANTON AVE. ROSE AVE. DIVISION ST. 675 29 49 19575 <br />LAS LOMITAS DR, ANGEL& END 108 37 11 3996 <br />MADEIRA DR. TOURIGA DR. E/O SYLVANER CT. 797 37 22 29489 <br />SYLVANER CT. MADEIRA DR. END 177 29 20 7647 <br />MUSCAT CT. MADEIRA DR. END 276 29 23 10518 <br />CLARET CT. NORTON WY. END 229 29 29 9155 <br />TANNET CT. NORTON WY. END 226 29 29 9068 <br />GAMAY CT. NORTON WY, END 241 29 26 9503 <br />MERLOT CT. NORTON WY,. END 233 29 37 9271 <br />MALBEC CT. NORTON WY. END 231 29 17 9213 <br />POMACE CT. MADEIRA DR, END 273 29 14 10431 <br />CHATELI CT. SYLVANNER DR. END 230 29 9 9184 <br /> <br />(*) PCI: Pavement Condition Index [An index number ranging from 0-100 (100 being a new <br />pavement surface) depicting the condition and serviceability of the street pavement.] <br /> <br />Staff has recommended that the construction methods to be utilized for this project be "Total <br />Recycle" with base stabilization. This construction method includes treating existing crushed <br />asphalt concrete, base materials and native soil with a 4% by weight base stabilizer and paving <br />over the prepared base with a layer of asphalt concrete (AC). The" Total Recycle" method <br />does not require off-hauling of existing AC, but recycles those materials on site. The recycle <br />process proposed will add strength to existing roadway base material in place. The addition of <br />4 % base stabilizer will add strength and stabilize the existing unstable soil directly under the <br />pavement. <br /> <br />Project No. 045004 ( Slurry Sealing of Various City Streets) <br /> <br />Project No. 045004 consists of the application of a slurry seal coating to approximately <br />1,085,000 square feet to the following fifteen (15) City streets with latex emulsified asphalt <br />with Type II black volcanic aggregate. Slurry sealing is used to extend the life of existing <br />street pavements when the Pavement Condition Index still exceeds 70. The subject project <br />was authorized under the 2004/2005 Capital Improvement Program (CIP) budget for design <br />and construction. <br /> <br /> STREET NAME BEGIN LOCATION END LOCATION LENGTH WIDTH AREA <br /> STONERIDGE MALL RD. STONERIDGE DR. FABIAN CT. 1,145 54 73,750 <br /> STONERIDGE MALL RD. FABIAN CT. EMBARCADERO CT. 1,024 54 56,775 <br /> STONERIDGE MALL RD. EMBARCADERO CT. CANYON WY. 2,24~ 54 121,014 <br /> STONERIDGE MALL RD. CANYON WY. SPRINGDALE AVE. 2,665 54 143,910 <br /> STONERIDGE MALL RD. SPRINGDALE AVE. STONERIDGE MALL DR. 784 54 42,336 <br /> SPRINGDALE AVE. STONERIDGE DR. STONERIDGE MALL RD. 835 45 48,650 <br /> LAUREL CREEK WY. FOOTHILL RD. STONERIDGE MALL RD. 875 48 52,700 <br /> DEODAR WY. FOOTHILL RD. STONERIDGE MALL RD. 406 48 23,550 <br /> CANYON WY. FOOTHILL RD. STONERIDGE MALL RD 806 57 57,665 <br /> DEL SOL AVE. BEVILAQUA CT. MIRADOR DR. 1,365 33 45,010 <br /> DEL SOL AVE. ENTRADA DR. END 288 33 9,504 <br /> CROCE CT. DEL SOL END 135 33 5,492 <br /> BARBARA CT. DEL SOL END 98 33 4,271 <br /> SR:05:217 <br /> Page 3 of 6 <br /> <br /> <br />