My WebLink
|
Help
|
About
|
Sign Out
SR 05:203
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:203
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2005 11:40:38 AM
Creation date
7/14/2005 11:10:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/19/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stabilized as soon as possible after completion of grading, in no case later than <br /> October 15. No grading shall occur between October 15 and April 15 unless approved <br /> erosion control measures are in place, subject to the approval of the Building Department. <br /> Such measures shall be maintained until such time as permanent landscaping is in place. <br /> <br />35. The developer shall submit a dust control plan or procedure, subject to approval of the <br /> Planning Director and City Engineer, as part of the improvement plans. Gray water shall <br /> be used for dust control or grading activities. This water may be obtained from the <br /> Dublin San Ramon Services District (DSRSD) Waste Water Treatment Plant at 7399 <br /> Johnson Drive, Pleasanton, unless otherwise approved by the City Engineer. <br /> <br />36. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of a <br /> dedicated public street or public service easement approved by the City Engineer shall be <br /> privately maintained by the property owners. <br /> <br />37. The design of the water supply system shall be subject to the review and approval of the <br /> City Engineer. <br /> <br />38. Approval of the storm drainage system shall be subject to the review and approval of the <br /> City Engineer and Zone 7, as applicable, that the system is adequate, connects to an <br /> approved point of discharge, meets any and all applicable requirements of the Alameda <br /> County Flood Control District - Zone 7, meets any and all applicable requirements of the <br /> Federal Emergency Management Flood Hazard Program, the California Department of <br /> Fish and Game, and meets the immediate and long-range requirements of this <br /> development and all upstream areas intended to be drained through this development. <br /> <br />39. All utilities required to serve the proposed development shall be installed underground, <br /> unless otherwise determined by the City Engineer. <br /> <br />40. The applicant shall submit a final utility plan showing the proposed water supply and <br /> electric power distribution for the site. Said plan shall be subject to the review and <br /> approval of the City Engineer and the Planning Director prior to the issuance of any <br /> building permits. <br /> <br /> 41. Any damage to existing street or sidewalk improvements during construction on the <br /> subject property shall be repaired to the satisfaction of the Planning Director and City <br /> Engineer at full expense to the developer. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> <br /> 42. The applicant's contractor(s) shall obtain an encroachment permit from the City Engineer <br /> prior to moving any construction equipment onto the site. <br /> <br /> Page-6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.