My WebLink
|
Help
|
About
|
Sign Out
SR 05:209
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2005 10:08:49 AM
Creation date
7/14/2005 10:03:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/19/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:209
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Valley Road Underpass Project <br /> Revised Cost Proposal <br /> Date of Revision: 07.05.2005 <br /> <br />Task: Box Culvert Construction <br /> <br />Staff Hours Rate Cost Extended <br />Lead Bridge Inspector 120 $ 103.00 $12,360.00 <br /> SUBTOTAL $12,360.00 <br /> <br />Task: Bridge Inspection <br /> Includes precast yard inspection; shoring installation; bridge construction <br /> <br />Staff Hours Rate Cost Extended <br />Lead Bridge Inspector 350 $103.00 $ 36,050.00 <br />Concrete Sampling @ Plant $ 600.00 <br /> SUBTOTAL $ 36,650.00 <br />Task: Pump House Construction <br /> Includes building constructionl electrical/SCADA hookups; <br /> mechanical connections <br /> <br />Staff Hours Rate Cost Extended <br />Lead Bridge Inspector 176 $ 103.00 $18,128.00 <br />Lead Electrical Inspector 16 $ 103.00 $ 1,648.00 <br />Lead Civil Inspector 8 $103.00 $ 824.00 <br /> SUBTOTAL $ 20,600.00 <br /> <br />Task Independent Check of Contractor's Shoring <br /> Based on 1 initial review; 1 minor revision review; field review <br /> <br />Staff Hours Rate Cost Extended <br />Principal Engineer- BLCE 24 $ 150.00 $ 3,600.00 <br />StaffEngineer-BLCE 16 $ 85.00 $ 1,360.00 <br /> SUBTOTAL $ 4,960,00 <br /> <br />Task: Project Manager <br /> Misc. meetings; field review of shoring; review of girder pick plans <br /> <br /> Staff Hours Rate Cost Extended <br /> Project Manager 20 $ 130.00 $ 2,600.00 <br /> SUBTOTAL $ 2,600.00 <br /> <br /> TOTAL ESTIMATED COST $ 77,170.00 <br /> <br /> The above operations may overlap with bridge construction. The use of 1 inspector is anticipated to <br /> cover any overlapping work. <br /> <br /> NOTES: <br /> 1. The above operations may overlap with bridge construction. The use of 1 inspector is anticipated to <br /> cover any overlapping work. <br /> 2. Rate includes wage, overhead, profit, cell phone, computer, and vehicle for employee. <br /> 3. A rate of $125.00/hr will be used should overtime services become necessary for inspector positions. <br /> 4. Rates for additional resources will be negotiated should the City require other services. <br /> 5. Concrete sampling at plant assumes 1 day pour and 6 cylinder breaks. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.