Laserfiche WebLink
CONTRACT FOR CONSULTANT SERVICES <br /> FOR MONITORING OF THE GEOLOGIC HAZARDABATEMENT DISTRICTS <br />(GHAD'S) (OAK TREE FARM, TRACT 6563 AND TRACT 6748; MOLLER RANCH, <br />TRACT 6618; LAUREL CREEK ESTATES (THE PRESERVE, OAK HILL ESTATES, <br /> AND KOLB RANCH ESTATES), TRACT 6400, TRACT 6590, TRACT 7045, AND <br /> TRACT 6951; AND LEMOINE RANCH ESTATES, TRACT 7176) <br /> <br /> THIS AGREEMENT is made and entered into this day of ,2005, by and <br />between the CITY OF PLEASANTON, a municipal corporation ("City"), and Engeo Incorporated <br />whose address is 2010 Crow Canyon Place, Suite 250, San Ramon, California 95583-4634, and <br />telephone number is (925) 866-9000, ("Consultant"). <br /> <br /> WlTNESSETH: <br /> <br /> A. Consultant is qualified to provide, and experienced in providing geotechnical engineering <br />services and has offered its services for the purposes specified in this Agreement. <br /> <br /> B. In the judg~aent of the City, it is necessary and advisable to employ the services of <br />Consultant for the purposes provided herein. <br /> <br /> NOW THEREFORE, in consideration of the mutual covenants, agreements and conditions <br />contained herein, City and Consultant agree as follows: <br /> <br /> 1. Consultant's Services. Consultant shall diligently perform the services and furnish the <br />materials, reports, drawings, and related materials as hereinafter set forth: <br /> <br /> a. Consultant shall perform all work described in Exhibit "A, B, C and D", Scope of <br /> Work, attached hereto and incorporated herein by this reference. <br /> <br /> b. Consultant shall meet with the technical staff of the City, other pertinent agencies, <br /> and/or landowners as necessary to complete the scope of work outlined in Section <br /> 1 (a) above. <br /> <br /> 2. City Services. In order to assist Consultant in this work, City shall provide, if necessary, <br />title reports, any existing plans of the area on file, necessary direction and plan checking within a <br />reasonable time. <br /> <br /> 3. Staff. The Project Manager for Consultant shall be Patrick S. Lam, who may not be <br /> replaced without written consent of City. <br /> <br /> 4. Sufficiency of Consultant's Work. All reports, drawings, plans and specifications <br /> prepared for City shall be adequate and sufficient to meet the purposes for which they are prepared. <br /> <br /> SR:05:189 <br /> Page 4 of 8 <br /> <br /> <br />