My WebLink
|
Help
|
About
|
Sign Out
SR 05:189
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2005 10:08:49 AM
Creation date
7/14/2005 9:19:05 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/19/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:189
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PREFERRED CLIENT FEE SC~rF. DULE <br /> Eff~ctiv~ February 2005 <br /> <br />PROFESSIONAL SERVICES: <br />President ............................................................................................................................ $250.OO per hour <br />Principal Engineer/G-eologist ............................................................................................ $190.00 per hour <br />Associate Engineer/C~ologkst ........................................................................................... $170.00 per hour <br />Senior Engineer/Geologist ................................................................................................ $140.00 per hour <br />Project Engineer/Geologist ............................................................................................... $123.00 per hour <br />Staff Engineer/Oeologist .................................................................................................. $115.00 per hour <br />Assistant Engineer .............................................................................................................. $85.00 per hour <br />Field Manager ................................................................................................................... $115.00 per hour <br />Senior Engineering Technician .................................................................................. $95.00 pet hour*/** <br />Gcoxe~anical Engineering Technician ........................................................................ $g5.00 per hour*/** <br />Environmenlal Technician ................................................................................................ $90.00 per hour* <br />Special Inspector ......................................................................................................... $85.00 per hour*l** <br />Lab Technician/Manager .................................................................................................. $80.00 per hour* <br />CAD Specialist ................................................................................................................... $g5.00 per hour <br />Network Administrator ....................................................................................................... sg0.00 per hour <br />Project Assistant ................................................................................................................. $69.00 per hour <br /> <br />OVERTIME RATES AND OTHER FEES: <br />*Rates increased by factor of 1.5 for all hours worked i.n excess of eight (g) ~M??y .?~o, ugh Fri~y; <br />and the first eight(g) hou~ work~, on S,at~'~ .d~,y. R~,~s increase~d by. factor ofz~s .~o~r.a~,,,nou~w~o~o <br />in excess of twelve (12) Monday ~tl~o~ ~u~n rnoay, ati hours woxxea m excess ot e~gnt ~.~) on ~amraay <br />and all hours worked on Sunday ana nouaays. <br /> <br />*Two hour minimum portal to portal. Travel time and pick-up and delivery will be billed based on <br />normal hour!y rates, poi~l to po~al.. , .... <br />* *For Prevailing Wage projects, ~ the houny rote oy ~. <br /> <br />Equipment and materials will be charged in addi6on to the above hourly rates. <br />DEPOSITION~ COURT APPEARANCE: <br />Minimum Charge ........................................................................................................... $1,400.00 half day <br /> $2,800.OO full day <br />OUTSIDE CONSULTANTS~ SUBCONTRACTED <br />SERVICES AND EQUIPMENT RENTAL: .................................................................. Cost Plus 18% <br /> <br />TERMS OF PAYMENT: Invoices will be submitted at completion of work or at approximat~:ly two <br />week intervals and are due and pay_able upon receil~... Statements will be issued at m0mhly intervals. <br />Charges not paid within 30 days of invoice date wdl accrue a late charge at a rate of 1.5 percent per <br />month. In the event it becomes necessary to commence suit to collect amount due, Client ag~es to pay <br />attorney's fees and costs, as r. he court may deem reasonable until amount is paid. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.