Laserfiche WebLink
Zone 7 Channel <br />· ~ ' City Proposect Design Per Plans Received 9-04 and Modified based on Cit <br /> Meeting 2/8/05 <br /> <br /> Unit Cost Total Cost <br /> <br /> Grading - Main Channel: 147,900.00 <br /> Access Road: 15,791.25 <br /> Aggregate Ease Cost -8"AB 28,424,25 <br /> Cost - 2" AC(Eliminated per <br /> City letter 1-25-05 3,520,00 <br /> 2" Decomposed Granite <br /> TO UPRR 9,311,25 <br /> of existing Channel 52,000.00 <br /> Excavating - Lowering channel from <br /> point E-2-1 to the conform on phase 1 110,00000 <br /> <br /> Barbed wire only at <br /> lannel crosses over 5.00 3,000 <br /> buded concrete drop <br /> FC202 on Page P4 <br /> 6,000.00 <br /> Mobilization 70,000,00 70,000.00 <br /> LandsCaping: <br /> Soil prep/fine grade: <br /> Water Meter 1" for GBH 1 1/2" fo <br /> <br /> Icrigafion - 12/24 station: <br /> Tree Pots (+/-Sg size) <br /> Liners - Shrubs: <br /> Plugs - grasses: <br /> Cuttings - Willow. Blackberry: <br /> and Rushes Dee <br /> Hydro seed Native Grasses <br /> Erosion control): <br /> <br /> Per City ~etter dated 1-25~35 use total <br /> of $52,000 an acre at 4~6 acres for a <br /> <br /> a credit to adjust line items 20-29 to <br /> 90 Day Maint <br /> Yearly reports: <br /> <br /> 3ennit Costs - Zone 7 18,620,46 <br /> $ 44,000.00 44~000 <br /> $ 23,000 00 23,000 <br /> at 3% <br /> <br /> $ <br /> 174,760 <br /> Grand Total WI Contingency: t ,339,827 <br /> <br /> 43 ~/$?06,000.00 <br /> 44 Less BIC Cutvert: <br /> Total, Lees BIC Culvert: $ 489,067.2'1 <br /> <br /> 46 <br /> ~ 48 Grand To~l WI COntingency: $ 493,463.00 ~ <br /> · EXHIBIT <br /> <br /> <br />