My WebLink
|
Help
|
About
|
Sign Out
RES 05052
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2000-2009
>
2005
>
RES 05052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 10:58:13 AM
Creation date
7/5/2005 10:46:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/21/2005
DOCUMENT NO
RES 05052
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL IMPROVEMENT PROGRAM <br /> STREETS PROJECTS <br /> Quarter 2 <br />co5o~ Foothill Road Widening at Dublin Canyon Road 0 <br />005014 1-580 Corridor ManagemenffSi~nals, Phase II 0 <br /> <br />~o5ot7 1-580 Corridor ManagementlSi~nals. Phase I 499.833 (9,179~ (400,759~ 89.895 <br />ooso~n Hepyard Road and Owens Drive Widening Phase Il 0 <br />oo5o~9 Bemal Avenue Widening from Vineyard to Arroyo Del Valle 0 <br />co5o~o Del Valle Parkway: Ext from First Str to California Ave (Addl Funding) 0 <br />oo5o~s Boreal/l-680 Interchange (61.919)i 161,919) <br />oo5o~9 West Las Positas Resuffacin[.: Tassajara Creek/Hacienda (55,000) (55~000) <br />olso32 Mohr Ave Sidewalk Construction: Kolln Str to Abandoned Railroad ROW 0 <br />m5o~3 Staneridgn Drive Roadway Landsceping 0 <br />015034 Up~radc Traffic Signal Services (l 7~278) (17~2781 <br />ol5o4~ Tri-VnNey Transportation Develepmcnt Fcc Reserve 0 <br />o~sc~? [580/El Charro Interchange Study 0 <br />o~5o~s Street Lighting Up~rades I00~000 3Or000 130,000 <br />o25om Annual Resurfacing of Various Streets (154~210) 154,210 0 <br />o25oo? Annual Traffic Buttons and Line Markers Installation (8,177) (3,558) (11 ~7351 <br />025o~4 Vineyard Corridor Infrastructure Improvements Phase I 8,118 8~118 <br />025015 Sunol Bird at 1~80 South Bound OffRamp: Install New Traffic Signal 11,961 219,867 231,828 <br />o25ols Sunol Blvd Reconstruction {or Widening): lunipero to 1~80 Phase I 0 <br />025o10 Foothill at Muinan~xl Dr. South: Street AlignmentNew Traffic Signal (120,000~ (120,000) <br />025023 Dougherty Valley Mitigation Revenue Reserve (S&O00/ (58,000~ <br />o25o39 Traffic Signal at Pleasanton Ave and Bemal 7~234 7,234 <br />o25o40 Traffic Signal at West Las Positas and Dorman (17,445~ (17,445~ <br />oz~oal Traffic Signal at Vineyard and Montevino (11,960~ (11,960~ <br />m~o42 Bemal St Improvements at Valley (8,4501 il,218} (9,668) <br />o25o71 First and Kottinger Undergrounding for Street Lights and Latarals 426,113 426,113 <br />o35co3 Annual Resurfacing of Various Streets (516,915~ (1197737) 385,652 (251,000~ <br />o3s~oa Annual Slun), Sealing of Various Streets 20.000 20,000 <br />o35~o5 Annual Sidewalk and Intamection Ramp Installations (15~610} (15~610) <br />o3~0os Happy Valley Byl~ass Road 0 <br />o~5oo7 Annual Traffic Buttons and Line Markers Installation II 00,000) /100~000) <br />o~soeo Annual Curb and Gutter Replacements for Sto~et Rcsurfacing Pro~eets 0 <br />o35ol2 Annual Sidewalk Maintenance 7,767 7,767 <br /> Hacienda Drive ~ Ovens Drive: Reconfigure Intersection and Upgrade <br />o35o~o Traffic Signal (49,000~ (49.000~ <br /> <br /> SR 05_166 Streets CIP Adjusted Budget.xls B-2 6/I 3/2005 11:32 AM <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.