My WebLink
|
Help
|
About
|
Sign Out
PC-94-50
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1994
>
PC-94-50
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:35 AM
Creation date
6/29/2005 4:03:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/14/1994
DOCUMENT NO
PC-94-50
DOCUMENT NAME
Z-94-172
NOTES
FRANK AUF DER MAUR/KONRAD RICHENBACH
NOTES 3
ONE-STORY BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-94-50 <br />Page 7 <br /> <br />3l. The developer shall pay any and all fees to which the property <br />may be subject prior to occupancy. <br /> <br />Building <br /> <br />32. All building and/or structural plans must comply with all <br />codes and ordinances in effect before the Building Department <br />will issue permits. <br /> <br />33. The paving sections for the on-site parking and drive areas <br />shall be designed on the basis of an R-Value test and a <br />traffic index to carry the anticipated traffic loads. This <br />design shall be subject to the approval of the Director of <br />Building Inspection. The minimum paving section shall be 2" <br />A.C. on 6" of A.B. The minimum A.C. pavement slope shall be <br />1%. For pavement slopes of less than 1%, the surface runoff <br />shall be carried in a concrete gutter to an acceptable point <br />of discharge. The minimum slope for concrete gutter shall be <br />0.5%. <br /> <br />34. A sanitary sewer sampling manhole shall be provided on each of <br />the sanitary sewer lateral from each building, unless <br />otherwise waived by the Director of Building Inspection. <br /> <br />35. Prior to issuance of a building permit, the developer shall <br />pay the applicable Zone 7 and City connection fees and water <br />meter cost for any water meters, including irrigation meters. <br />Additionally, the developer shall pay any applicable Dublin <br />San Ramon Services District (DSRSD) sewer permit fee. <br /> <br />36. The developer shall submit two copies of the site soils report <br />to the Director of Building Inspection for third party peer <br />review and shall pay for such review at the time specified by <br />the Director, but in all cases before the issuance of a <br />grading permit. <br /> <br />37. The soils engineer shall certify the pad compactions of all <br />lots containing fill to the satisfaction of the Director of <br />Building Inspection prior to the issuance of building permits. <br /> <br />Fire <br /> <br />38. The developer shall post address numerals on the building so <br />as to be plainly visible from all adjoining streets or <br />driveways during both daylight and night time hours. Tenant <br />spaces shall be identified as determined by the city. <br /> <br />39. The development shall meet all requirements of the Pleasanton <br />Fire Code (Chapter 20.24 of the Pleasanton Municipal Code). <br />
The URL can be used to link to this page
Your browser does not support the video tag.